2.
Screw stem protection tube [2] into thread and tighten it firmly.
Information: For stem protection tubes made of two or more segments, all
parts have to be thoroughly screwed together.
Figure 20: Protection tube made of segments with threaded sleeves (SA
25.1/30.1: >900 mm)
[2]
Segment of stem protection tube
[3]
V-seal
[4]
Threaded sleeve
3.
Push down the sealing ring [3] onto the housing.
Information: For mounting segments, push down seals of segments down to
the sleeve (connecting piece).
4.
Check whether protective cap [1] for stem protection tube is available, in perfect
condition and tightly placed on or screwed to the tube.
Risk of bending or oscillation of protection tubes exceeding a length of 2 m!
Risk of damage at stem and/or protection tube.
→
Secure protection tubes exceeding 2 m by an appropriate support.
23
SAEx 25.1 – SAEx 40.1 / SAREx 25.1 – SAREx 30.1
ACExC 01.2
Assembly
Содержание A 25.2
Страница 5: ...108 Index 111 Addresses 5 SAEx 25 1 SAEx 40 1 SAREx 25 1 SAREx 30 1 ACExC 01 2 Table of contents...
Страница 100: ...14 2 Actuator controls ACExC 01 2 KP KPH 100 SAEx 25 1 SAEx 40 1 SAREx 25 1 SAREx 30 1 Spare parts ACExC 01 2...
Страница 102: ...14 3 Actuator controls AUMATIC ACExC 01 2 KES 102 SAEx 25 1 SAEx 40 1 SAREx 25 1 SAREx 30 1 Spare parts ACExC 01 2...
Страница 104: ...14 4 Actuator controls ACExC 01 2 KT KM 104 SAEx 25 1 SAEx 40 1 SAREx 25 1 SAREx 30 1 Spare parts ACExC 01 2...
Страница 106: ...14 5 ExC wall bracket 106 SAEx 25 1 SAEx 40 1 SAREx 25 1 SAREx 30 1 Spare parts ACExC 01 2...
Страница 111: ...111...