![auer 753020 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/auer/753020/753020_installation-manual_3015799007.webp)
-
INSTALLATION
PILOT
-C14-
MANUAL
-
7
1.
38L
buff er tank
2.
Circulator for heat pump
3.
Circulator fort heating circuit
4.
Electrical
heater
5.
Electronic
controller
6.
Power
board
7.
Heating
circuit
8.
Drain
9.
Back-up boiler (optional)
10.
Heat pump
3.5 - Operating principles
The
Pilot
must be placed in an area which is free from frost and
adverse weather conditions.
It must be placed as close to the heat pump as possible without
exceeding the maximum distance.
The maximum distance depends on the diameter of piping and the
number of elbows used (see «Hydraulic connection» tables).
The 2-core sheathed cable which connects the
Pilot
and the heat
pump measures 10m. There is a 20m length available as an optional
extra (Ref. 753102).
4 - INSTALLATION
4.1 - Placement choice
The Pilot must be installed on a level
and stable base which is distanced from
appliances used for cooking and other heat
sources.
4.1.1 - Appropriate placement choice
4.1.2 - Integration
Place and fi x the mounting bracket on the wall fi rst.
Then hang the pilot on the bracket using its tabs.