INSTALLATION
PILOT
-C14-
MANUAL
-
14
Ensure that:
- All work carried out on the hydraulic circuits and the electrical
circuits are in compliance with the regulations in effect
(inspection by a qualifi ed professional)
- The pressure relief valve on the cold water inlet of the domestic
hot water tank is working properly and is properly connected
to a drain in complaince with the regulations in eff ect.
- All piping is watertight.
- All hydraulic connections are properly tightened.
- The correct voltage at the mains switch.
- All of the valves are open and nothing is obstructing the
circulation of water in the exchanger and in the hydraulic
circuit.
- The installation is equipped with a fi lter valve or a fi lter on its
inlet and that the fi lter is not clogged.
- The automatic air purger’s cap is open.
- The exterior sensor and the ambient temperature control (if
present on the installation) are connected properly.
-If using an ambient thermostat, ensure that it is actually being
used and set to be on demand (turn it to its maximum set point).
Once all of these checks have been done, turn on the heat pump
and the
Pilot
.
5 - SET-UP
5.1 - Before set-up
Set-up must be done by a qualifi ed
professional.
Inspect the entirety of the hydraulic connections (nuts with washers,
toric joints or anything assembled with glue) which may loosen
during transport or during the installation process, and tighten if
necessary.
After pressurising the appliance, it is important to check the
watertightness (both visually and by any lowering of pressure) of
all internal and external connections.
Any deterioration of the appliance due
to a lack of watertightness renders the
warranty null and void.
5.2 - Check watertightness
5.3 - Starting set-up
When the
Pilot
is turned on for the fi rst time, it will ask
you to confi rm the language of use (French, English, German, Italian,
Spanish, or Polish), and will request to start set-up:
Choose
yes
and confi rm by pressing
.
COMMISSIO.
Activate the backfl ow prevention device of the installation to fi ll the
heating circuit to just over 1.5 bars of pressure.
The
Pilot
automatically confi rms the fi lling of the
installation once the pressure reaches 1.6 bars.
A manual confi rmation (press
) is possible starting at 0.6
bars of pressure.
5.5 - Step 2: Filling
During the fi lling stage, the
Pilot
indicates the pressure measured
in the heating circuit.
Filling
N
OTE
: If you choose not to start set-up (
NO
) this option remains
accessible in the expert menu, by the
COMMISSIO
. sub-menu.
For optimal commissioning, make sure
that all the required accessories (room
control, decoupling kit, 2-circuit kit, etc...) are
connected before starting the commissioning
wizard. For room thermostats, make sure they
are in demand for heating (sending a closed
contact to the driver).
5.4 - Step 1: Circuit choice
Select the kind of circuit connected
(domestic hot water, radiators)
and the associated control (sensor,
thermostat).
N
OTE
: Circuits and controls are proposed according to the connected
sensors.