![ATTACK ATTACK DPX 25 COMBI Pellet Скачать руководство пользователя страница 87](http://html.mh-extra.com/html/attack/attack-dpx-25-combi-pellet/attack-dpx-25-combi-pellet_instructions-for-use-manual_3005321087.webp)
15
14. POSITION OF LEVER OF TURBULATORS BY CLEANING
To clean space under exchanger of the DPX 15, 25, 35 boilers, it is necessary to lift lever of
turbulators fully up, turbulators go into the pipes and thereby there is free space for cleaning. By
the DPX 45 boiler it is ideal to lift the lever into middle position.
Содержание ATTACK DPX 25 COMBI Pellet
Страница 1: ...www attack sk EN 07 2019 ATTACK DPX COMBI PELET Instructions for use EN ...
Страница 2: ......
Страница 66: ...65 EN 13 ELECTRICAL SCHEMES 13 1 ATTACK DPX 25 30 35 COMBI PELLET ...
Страница 68: ...67 EN 13 2 ATTACK DPX 40 45 50 COMBI PELLET ...
Страница 83: ...11 ...
Страница 98: ......
Страница 99: ......