3
CONTENTS
1. INSTALLATION AND CHIMNEY PARAMETERS................................................................................................. 4
2. VERIFICATION OF THE CORRECT CHIMNEY PARAMETERS ......................................................................... 5
3. DEVICES FOR CHIMNEY DRAUGHT MEASURING ........................................................................................... 6
4. OPERATION PRESSURE IN HYDRAULIC CIRCUIT ............................................................................................ 7
5. BOILER PROTECTION AGAINST EXCESSIVE CONDENSATION – ATTACK-OVENTROP ........................ 7
6. CORRECT ASHTRAYS POSITION ........................................................................................................................... 8
7. FUEL .............................................................................................................................................................................. 8
8. AFTERCOOLING CIRCUIT INSTALLATION ......................................................................................................... 9
9. CORRECT ADJUSTMENT OF AIR INLETS ............................................................................................................ 9
10. ASHTRAY CLEANING .......................................................................................................................................... 10
11. HOW TO CLEAN SPACE AROUND THE ASHTRAY ..................................................................................... 12
12. EXCHANGER PIPES CLEANING BY LEVER OF TURBULATORS ............................................................... 13
13. HOW TO CLEAN SPACE UNDER EXCHANGER ........................................................................................... 14
14. POSITION OF LEVER OF TURBULATORS BY CLEANING .......................................................................... 15
15. TOOLS FOR CLEANING OF SPACE UNDER EXCHANGER ........................................................................ 16
16. CONTROL OF TUBULAR EXCHANGER´S FUNCTIONALITY ..................................................................... 17
17. ACCESS TO TUBULAR EXCHANGER .............................................................................................................. 17
18. EXCHANGER´S COVER REMOVAL .................................................................................................................. 18
19. CONTROL OF CORRECT FUNCTION OF THE HEAT-UP FLAP ................................................................. 18
20. TURBULATOR THREADS CLEANING.............................................................................................................. 19
21. CLEANING OF THE VENTILATOR´S OPERATION AREA ............................................................................ 20
22. CLEANING OF RADIAL IMPELLER’S VANES ................................................................................................. 21
23 SUMMARY OVERVIEW OF REGULAR CLEANING OF PARTICULAR BOILER PARTS .......................... 22
Содержание ATTACK DPX 25 COMBI Pellet
Страница 1: ...www attack sk EN 07 2019 ATTACK DPX COMBI PELET Instructions for use EN ...
Страница 2: ......
Страница 66: ...65 EN 13 ELECTRICAL SCHEMES 13 1 ATTACK DPX 25 30 35 COMBI PELLET ...
Страница 68: ...67 EN 13 2 ATTACK DPX 40 45 50 COMBI PELLET ...
Страница 83: ...11 ...
Страница 98: ......
Страница 99: ......