14 Set up protocol
i
After successful set up, complete this form fully, sign it, make a copy and send to the manufacturer
within a week.
Otto Nußbaum GmbH & Co.KG
Korker Straße 24
D-77694 Kehl-Bodersweier
The !y!tem ;ith !erial number
;a! !et up on (date)
at
(company name)
in (to;n, city)
checked for function and safety and put into operation.
.
The !et up ;a! done by the operating company
”
!peciali!t (!core out the one that doe! not ap-
ply).
The operating company confirm! proper !y!tem !et up, ha! read and ;ill comply ;ith all informa-
tion contained in this operating manual and inspection book, and will keep this document acces-
sible to trained operators at all times.
The !peciali!t confirm! proper !y!tem !et up, ha! read all information in thi! operating manual and
inspection book, and has transferred the documents to the operating company.
Date
Name, Operating company & company stamp
Operating company signature
Date
Na me, Specialist
Specialist signature
Service partner:
Stamp
Only fill out if the !y!tem ha! a fi’ed anchor.
Anchor used *)
Type/ brand
Minimum anchor depth *) complied with:
mm
Tightening torque *) complied with:
Nm
*) See 4.2.1 selecting the anchor
AD H9402
19.05.2015
JUMBO LIFT 3200 NT - HYMAX XX 3200 PH
85