Manual, Control Module, PROFINET, DL12
Document #9620-20-C-DL12-06
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
C-32
Figure 4.5—Master Coupled with Tool
RTL (R1)
Unlock (U)
RTL (R2)
Lock (L)
Green LED (Power)
Yellow LED
(Switch Made)
SF LED is Green
E2 LED is Red/Green
BF LED is Off
E1 LED is Red/Green
NOTICE:
If the LEDs don’t match what is shown, refer to
Section 2.1.3—System Failure and
Section 2.1.4—Ethernet 1 and Ethernet 2 LEDs
for possible issues.
4. Couple the Tool Changer.
a. Pulse the
Latch
ON minimum 500 ms.
b. The
Unlocked
input turns OFF a short time later, indicating piston travel. Subsequently,
the
Locked
input turns ON, indicating that the coupling operation is complete.
c. Power becomes available on the Tool and the
Tool Power is On
bit becomes ON.
d. Everything is OK
input is ON.
e. Tool-ID
becomes available.
f.
Shortly thereafter, communications should be established with downstream devices.
g. The
SSO_1,
SSO_2, V1RELAY, and V2RELAY
are ON (Subsequently
Unlatch Enable
is
ON).