parts can be reached. Boiler
inspection is only to be carried
RXWE\TXDOL¿HGVWDႇ
Removal of front panel
7KHIURQWSDQHOPXVW¿UVWEHUHPRYHG
to be able to carry out maintenance on
the boiler.
1. Unscrew the 2 screws of quick-
locks on top of front panel (A).
Push the quik locks (B) and remove
the front panel (C), (D) (= air box).
Removal of top panel
Top panel must be removed to be able
to reach the burner control unit.
2.
Press both external sides of the
control unit HMI (E) and rotate
the display (F).
3.
Pull the top panel in a forward
motion (G), (H).
Commissioning
Inspection
The panelling of the equipment
consists of metal and plastic parts,
which can be cleaned with a mild
(non-aggressive) cleaning agent.
When carrying out maintenance, only
original replacement parts may be
used.
Checks prior to commissioning
Changing settings such as burner
pressure and setting the amount
of air is not necessary.
Only in the case of failures or
replacement of the gas unit, venturi
and/or ventilator, does one have
to check and adjust the O
2
/ CO
2
percentage accordingly.
Following maintenance tasks
always check all gas-conducting
components on leakages by use
RIOHDNDJHGHWHFWLRQÀXLG/')
(2x)
(2x)