18
Installation
Boiler transport
1.
Remove the plastic strip.
2.
Open the 4 upper folders, and remove the documentation
and the condense pipe.
3.
Remove the cartboard inserts, remove the cartboard box.
4.
Remove the wall plate from the back of the boiler (removing one screw),
and remove the 4 screws on bottom part of the boiler.
5.
Install the boiler on the cascade (with a fork lifter).
6.
Install the boiler on the new wall plate (with a fork lifter).
7.
Remove the water and gas plastic cap, connect the condense pipe,
and follow the installation manual.
The ATAG XL W is a fully equipped
compact heating system, which has
been pre-set and tested at the factory.
The dimensions of the packaging are: -
65, 75, 105, 125, 150, 180, 210: 800 x
1200 x 750 mm (WxHxD).
This makes it possible to transport
all models in one piece through a
normal door.
The boiler can be picked up or from the
front with a forklift truck for transport.
Unpacking instructions are printed on
the cardboard box. Please follow the
proposed steps.
Disassembly of panelling
The panelling of the boiler can be
set aside, until the boiler is taken into
operation, so as to avoid damage.
Lifting and carrying precautions:
-
Wear protective clothing and gloves
to protect from any sharp edges.
-
The boiler has to be lifted from the
front with a forklift truck for transport.
Panelling should be attached and
VHFXUHGZLWKWKHVXSSOLHGVFUHZ
DIWHUDVVHPEO\RIWKHERLOHURUDIWHU
maintenance works.
1
4x
4x
4
2
7
5
A
B
3
A
B
C
6
A
B