BDP SERIES
* Emergency stop switch.
* Touch Display Controller
All devices include adjustable enthalpy control unit fully automatic with proportional control of the
gates in free-cooling models, and possibility to network (BARNET, MODBUS, and LON communication
protocol).
2.
PERFORMANCE MANUAL, INSTALLATION AND MAINTENANCE
2.1- INSTALLATION
2.1.1.
–
MACHINE INSTALLATION
These units are supplied fully assembled, with complete electrical wiring and its definitive load
of refrigerant charge. Furthermore, every machine has been tested in factory before being packaged
and shipped. (It is assembled and tested in the installation when the factory test is not possible).
The compressor contains its own oil charge (depending on model).
The hydraulic circuit of the unit has been carefully emptying to avoid residual water in the
casing of the evaporator and prevent any risk of corrosion in case of prolonged storage of the heat
pump.
For any information or queries regarding the unit, you need to inform us the model, serial
number and manufacture year.
2.1.2. - PROPERLY MACHINE LOCATION
1
–
It must be placed on a slab, strong enough to support the weight, avoiding water contact
with the bottom of the unit.
2 - It must take all cautions for avoid any vibration transmission on the floor, in the condenser
linkages or pipes:
- Rubber or antivibration materials under the chassis of the unit.
- Flexible hoses on suction and impulsion air (units with centrifugal fans).
- Antivibration hoses on hydraulic connections (depending on model).
3 - It must be ensured the air flow in coils.
The layout of the air ducts must be properly sized and the value of pressure loss does not
exceed the available pressure in fans.
4 - The air outlet and inlet of the unit will be installed at a sufficient distance from each other
in order to avoid air mixture.
5 - It would also provide for a door or removable part on outside air inlet in order to check the
state of coil dirt and it can be cleaned.
6
–
It is necessary to keep enough room (
Minimum 1 m.
free to the walls or to other items of
the installation) around the machine to allow maintenance of it.
Содержание BDP Series
Страница 1: ...HEAT PUMP BDP ...
Страница 23: ...BDP SERIES ANNEX A TECHNICAL FEATURES COOLING CIRCUIT 1 TECHNICAL FEATURES ...
Страница 24: ...2 COOLING CIRCUIT ONE CIRCUIT MODELS ...
Страница 25: ...3 COOLING CIRCUIT DOUBLE CIRCUIT MODELS ...
Страница 26: ...SERIES BDP ANNEX B OPTIONAL HYDRAULIC CIRCUIT 1 HOT COOL WATER COIL ...
Страница 27: ...SERIES BDP For different temperature increases consult technical features sticker 2 CONDENSER ...
Страница 28: ...SERIES BDP ANNEX C MAIN DIMENSIONS ...
Страница 29: ...SERIES BDP ANNEX D ELECTRIC DIAGRAM CONTROL ...
Страница 30: ...SERIES BDP ANNEX E ELECTRIC DIAGRAM POWER ...
Страница 31: ...SERIES BDP ANNEX F TERMINAL DIAGRAM ...
Страница 32: ...SERIES BDP ANNEX G PLUGS ...