
OPERATION
4-8
DRY NITROGEN PURGE (OPTIONAL)
A dry air purge system can be provided to reduce condensation within the chamber and on the
test item during temperature cycling. This option is primarily used to prevent a short circuit in
electronic components and is also used to lower humidity within the chamber.
To use the dry nitrogen purge:
The chamber must have been ordered with the dry nitrogen system and connected to a GN
2
source with a maximum pressure of 100 PSIG.
Close the chamber door and turn the PURGE Switch ON.
*The Nitrogen Purge is enabled through Event 1 in profile programming.
Dry Nitrogen Purge
Содержание SD-302
Страница 3: ......
Страница 7: ......
Страница 11: ......
Страница 27: ...OPERATION 4 12 Sample Profile ...
Страница 31: ......
Страница 32: ...MAINTENANCE 5 1 GENERAL MAINTENANCE TROUBLE ANALYSIS AND SERVICE GUIDE ...
Страница 43: ......