Dual control mixer with diverter

4

tYPIcAl SUItAble INStAllAtIoNS

a) Instantaneous gas-heated systems,
e.g. combination boilers

 

(fig.2)

The shower control MuST be installed with a 
multipoint gas water heater or combination 
boiler of a fully modulating design (i.e. 
to maintain relatively stable hot water 
temperatures).
A drop tight pressure reducing valve MuST 
be fitted if the supply pressures exceed 5 bar 
running.
An expansion vessel (shown in 

fig.2

) MuST 

be fitted, and regularly maintained, to ensure 
the shower mixer is not damaged by excess 
pressures. This may already be installed within 
the boiler (check with manufacturer) and is in 
addition to the normally larger central heating 
expansion vessel.
The layout and sizing of pipework MuST 
be such that nominally equal inlet supply 
pressures are achieved and the effects of 
other draw-offs are minimised. The hot supply 
temperature MuST remain a minimum of 10°C 
hotter than the required blend temperature for 
best performance.

b) Unvented mains pressure systems 

(fig.3)

The shower control can be installed with an 
unvented, stored hot water cylinder.
For systems with no cold water take off 
after the appliance reducing valve, it will 
be necessary to fit an additional drop tight 
pressure reducing valve when the mains 
pressure is over 5 bar. The drop tight pressure 
reducing valve must be set at the same value 
as the unvented package pressure reducing 
valve.

note:

 An additional expansion vessel 

(fig.3)

 

may be required if a second pressure reducing 
valve is installed. This does not apply to 
packages with a cold take off after the pressure 
reducing valve to the cylinder.
The layout and sizing of pipework MuST 
be such that nominally equal inlet supply 

Combination 

boiler 

CH flow 

Cold 

mains 

supply 

Hot water 

CH return 

Service 

valves 

Mixer 

valve 

Stop 

tap 

Expansion 

vessel 

Pressure 

reducing valve 

Fig.2 

(diagrammatic view — not to scale)

Service 

valves  

Balanced cold mains supply 

Cold mains supply 

Mixer 

Expansion 

vessel 

Pressure 

reducing valves 

Stop tap 

Unvented 

hot water 

storage unit 

Safety devices 

not shown 

Showerhead

Fig.3 

(diagrammatic view — not to scale)

Содержание Archetto

Страница 1: ...Installers please note these instructions are to be left with the user 2180474C March 2006 Installation and Operating Instructions Archetto Dual control shower with diverter built in...

Страница 2: ...pipes 8 Fitting the outlet pipework 9 Making good 9 Fitting the bulkhead 10 Fitting the cover plate and controls 11 12 Commissioning 12 13 Operating the shower 14 Cleaning 14 Spares 15 Fault finding...

Страница 3: ...temperature to a minimum of 52 C Water temperature at the inlet to the mixer must remain relatively constant when flow rate adjustments are made refer to the water heater operating manual to confirm c...

Страница 4: ...nents fig 1 Fig 1 1 Mixer valve 2 Cover plate 3 Temperature control retaining collar 4 Diverter control retaining collar 5 Temperature override control 6 Diverter control trim insert 7 Temperature han...

Страница 5: ...emises Note Where thermal store systems and instantaneous gas water heaters are used if excessive draw offs take place the boiler may not be able to maintain an adequate output temperature This could...

Страница 6: ...re for best performance b Unvented mains pressure systems fig 3 The shower control can be installed with an unvented stored hot water cylinder For systems with no cold water take off after the applian...

Страница 7: ...y be used with a gravity fed system with a pump to boost pressures as shown fig 5 Note Refer to Pump instructions for pressure requirements INSTANTANEOUS WATER HEATERS APPLIANCE CAPABILITIES In order...

Страница 8: ...siting of the shower Position the shower and showerhead on the wall so that all controls can be comfortably reached while using the shower The showerhead can be positioned either side of the shower Th...

Страница 9: ...d cold water supplies A BSP straight coupler needs to be fitted to the valve outlet Note These couplers are not supplied Screw the couplers into the inlets and the outlet of the valve The couplers mus...

Страница 10: ...e inlet positions Flush out the pipework in accordance with Water Regulations and Bylaws Offer the valve up to the pipework and secure with screws through the four fixing holes in the mixer Proceed to...

Страница 11: ...otrude from the wall surface between 8 mm and 13 mm Fit a hose to the threaded connector and direct it to waste Fit temporarily the diverter lever Open the supplies and test for leaks in all pipework...

Страница 12: ...ove the bulkhead assembly Check the location of the pipe in the wall before drilling Drill and plug the wall An appropriate drill bit should be used If the wall is brick plasterboard or a soft buildin...

Страница 13: ...inst the valve locking nuts and tiled wall Hold the cover plate in position and screw on the temperature control trim ring with the O ring in place to the temperature control fig 16 DO NOT tighten ful...

Страница 14: ...n the base to secure fig 20 Commissioning Important Check that all supply pipework has been flushed through before commissioning Make sure that both hot and cold water supplies are fully open and at o...

Страница 15: ...dle and remove the control trim Unscrew the retaining screw and remove the temperature override control Turn the diverter control to the tap position and turn on With a steady flow running adjust the...

Страница 16: ...just the water temperature rotate the temperature control handle clockwise for a cooler shower or anti clockwise for a hotter shower fig 25 Cleaning When the controls and cover plate require cleaning...

Страница 17: ...control handle 83309750 6 Trim 83309730 7 Flow control retaining collar 83309740 O rings 83309800 Ref Description Part No 1 Cover plate 83309760 2 Temperature control retaining collar 83309790 3 Overr...

Страница 18: ...Turn off shower and consult a competent plumber or contact Customer Service 1 5 1 Reduce the simultaneous demand from the supply 2 1 1 Refer to commissioning section 2 2 1 Turn the temperature contro...

Страница 19: ...d through before connecting the unit flow control damaged 3 5 1 Reduce the simultaneous demand 3 5 2 Check stop service valves are fully open 3 5 3 Check if sufficient water pressure 4 1 1 Fit a press...

Страница 20: ...ate of purchase and where applicable details of the particular fault 2 If required the Customer Service Advisor will arrange for a qualified engineer to call 3 All products attended to by a Triton ser...