Aspirante Archetto Скачать руководство пользователя страница 20

Triton Showers 

Triton Road 

Nuneaton 

Warwickshire  CV11 4NR

Triton is a division of Norcros Group (Holdings) Limited

TRITON reserve the right to change product specification without prior notice. E&OE. © TRITON SHOWERS 2012

Customer Service: 

0844 980 0750

Trade Installer Hotline: 

0844 980 0730 

Fax: 

 

0844 980 0744

www.tritonshowers.co.uk 

E-mail: [email protected]

TrITon STandard GuaranTEE

Triton guarantee this product against all mechanical 

defects arising from faulty workmanship or materials 

for a period of five years for domestic use only, from 

the date of purchase, provided that it has been 

installed by a competent person in full accordance 

with the fitting instructions. 
Any part found to be defective during this guarantee 

period we undertake to repair or replace at our 

option without charge so long as it has been 

properly maintained and operated in accordance 

with the operating instructions, and has not been 

subject to misuse or damage. 
This product must not be taken apart, modified or 

repaired except by a person authorised by Triton. 

This guarantee applies only to products installed 

within the United Kingdom and does not apply to 

products used commercially. This guarantee does 

not affect your statutory rights. 

What is not covered: 
1.

  Breakdown due to: 

a)

 use other than domestic 

use by you or your resident family; 

b)

 wilful act 

or neglect; 

c)

 any malfunction resulting from the 

incorrect use or quality of electricity, gas or water 

or incorrect setting of controls; 

d)

 failure to install 

in accordance with this installation guide. 

2.

  Repair costs for damage caused by foreign 

objects or substances.

3.

  Total loss of the product due to non-availability 

of parts.

4.

  Compensation for loss of use of the product or 

consequential loss of any kind.

5.

  Call out charges where no fault has been found 

with the appliance.

6. 

Call out charges where the water supply cannot 

be isolated, this includes consequential losses 

arising from unserviceable supply valves.

7. 

The cost of repair or replacement of pressure 

relief devices, showerheads, hoses, riser rails and/

or wall brackets, isolating switches, electrical 

cable, fuses and/or circuit breakers or any other 

accessories installed at the same time.

8. 

The cost of routine maintenance, adjustments, 

overhaul modifications or loss or damage arising 

therefrom, including the cost of repairing 

damage, breakdown, malfunction caused by 

corrosion, furring, pipe scaling, limescale, system 

debris or frost.

3-1-2012

uK SErVICE PoLICY

In the event of a product fault or complaint occurring, the following 

procedure should be followed:

1. 

Telephone Customer Service on 

0844 980 0750

 having available, 

your details including post code, the model number and power 

rating of the product, together with the date of purchase and, where 

applicable, details of the particular fault.

2. 

If required, the Customer Service Advisor will arrange  

for a qualified engineer to call.

3.

  All products attended to by a Triton service engineer must be installed 

in full accordance with the Triton installation guide applicable to the 

product. 

(Every product pack contains an installation guide, however, 

they can also be bought via our Customer Service Spares Department)

.

4.

  Our engineer will require local parking and if a permit is required this 

must be available to the engineer on arrival at the call. 

5.

  It is essential that you or an appointed representative 

(who must 

be over 18 years of age)

 is present for the duration of the service 

engineer's visit. If the product is in guarantee you must produce proof 

of purchase.

6.

  Where a call under the terms of guarantee has been booked and 

the failure is not product related 

(i.e. scaling and furring, incorrect 

water pressure, pressure relief device operation or electrical/plumbing 

installation fault)

 a charge will be made. A charge will also be issued 

if nobody is at home when the service engineer calls or adequate 

parking/permit is not available.

7.

  If the product is no longer covered by the guarantee an up front fixed 

fee will be charged before the site visit.

8.

  Should proof of purchase not be available on an “in-guarantee” call, 

or should the service engineer find that the product is no longer 

under guarantee, the engineer will charge the same fixed price and 

the customer will be expected to pay the engineer before he leaves. 

If payment is not made on the day an administration charge will be 

added to the fixed charge.

9.

  If a debt is outstanding from a previous visit, or from any other Triton 

purchase. Triton reserves the right to withhold service until the debt 

has been settled.

10.

  Triton takes the health, safety and wellbeing of its employees very 

seriously and expects customers to treat all staff members with respect. 

Should any employee feel threatened or receive abuse, either verbally 

or physically, Triton reserves the right to withhold service and will 

support the employee with a legal prosecution.

replacement Parts Policy

It is the policy of Triton Showers to maintain parts availability for the 

duration of production and a period of 5 years thereafter in accordance 

with industry standards. In the event of a spare part not being available a 

substitute part will be supplied.
Spare parts can be ordered via our online spare parts store, or by 

telephoning Triton Spares Department. Payment should be made by 

credit/debit card 

(excluding American Express or Diners Card)

. Payment 

can also be made by pre-payment of a pro-forma invoice, by cheque or 

postal order.
Telephone orders are based on information given during of the call. Before 

contacting Triton, please verify your requirements using the information 

contained in the user guide. Triton cannot accept liability for incorrect part 

identification.

Содержание Archetto

Страница 1: ...Installers please note these instructions are to be left with the user 2180474C March 2006 Installation and Operating Instructions Archetto Dual control shower with diverter built in...

Страница 2: ...pipes 8 Fitting the outlet pipework 9 Making good 9 Fitting the bulkhead 10 Fitting the cover plate and controls 11 12 Commissioning 12 13 Operating the shower 14 Cleaning 14 Spares 15 Fault finding...

Страница 3: ...temperature to a minimum of 52 C Water temperature at the inlet to the mixer must remain relatively constant when flow rate adjustments are made refer to the water heater operating manual to confirm c...

Страница 4: ...nents fig 1 Fig 1 1 Mixer valve 2 Cover plate 3 Temperature control retaining collar 4 Diverter control retaining collar 5 Temperature override control 6 Diverter control trim insert 7 Temperature han...

Страница 5: ...emises Note Where thermal store systems and instantaneous gas water heaters are used if excessive draw offs take place the boiler may not be able to maintain an adequate output temperature This could...

Страница 6: ...re for best performance b Unvented mains pressure systems fig 3 The shower control can be installed with an unvented stored hot water cylinder For systems with no cold water take off after the applian...

Страница 7: ...y be used with a gravity fed system with a pump to boost pressures as shown fig 5 Note Refer to Pump instructions for pressure requirements INSTANTANEOUS WATER HEATERS APPLIANCE CAPABILITIES In order...

Страница 8: ...siting of the shower Position the shower and showerhead on the wall so that all controls can be comfortably reached while using the shower The showerhead can be positioned either side of the shower Th...

Страница 9: ...d cold water supplies A BSP straight coupler needs to be fitted to the valve outlet Note These couplers are not supplied Screw the couplers into the inlets and the outlet of the valve The couplers mus...

Страница 10: ...e inlet positions Flush out the pipework in accordance with Water Regulations and Bylaws Offer the valve up to the pipework and secure with screws through the four fixing holes in the mixer Proceed to...

Страница 11: ...otrude from the wall surface between 8 mm and 13 mm Fit a hose to the threaded connector and direct it to waste Fit temporarily the diverter lever Open the supplies and test for leaks in all pipework...

Страница 12: ...ove the bulkhead assembly Check the location of the pipe in the wall before drilling Drill and plug the wall An appropriate drill bit should be used If the wall is brick plasterboard or a soft buildin...

Страница 13: ...inst the valve locking nuts and tiled wall Hold the cover plate in position and screw on the temperature control trim ring with the O ring in place to the temperature control fig 16 DO NOT tighten ful...

Страница 14: ...n the base to secure fig 20 Commissioning Important Check that all supply pipework has been flushed through before commissioning Make sure that both hot and cold water supplies are fully open and at o...

Страница 15: ...dle and remove the control trim Unscrew the retaining screw and remove the temperature override control Turn the diverter control to the tap position and turn on With a steady flow running adjust the...

Страница 16: ...just the water temperature rotate the temperature control handle clockwise for a cooler shower or anti clockwise for a hotter shower fig 25 Cleaning When the controls and cover plate require cleaning...

Страница 17: ...control handle 83309750 6 Trim 83309730 7 Flow control retaining collar 83309740 O rings 83309800 Ref Description Part No 1 Cover plate 83309760 2 Temperature control retaining collar 83309790 3 Overr...

Страница 18: ...Turn off shower and consult a competent plumber or contact Customer Service 1 5 1 Reduce the simultaneous demand from the supply 2 1 1 Refer to commissioning section 2 2 1 Turn the temperature contro...

Страница 19: ...d through before connecting the unit flow control damaged 3 5 1 Reduce the simultaneous demand 3 5 2 Check stop service valves are fully open 3 5 3 Check if sufficient water pressure 4 1 1 Fit a press...

Страница 20: ...ate of purchase and where applicable details of the particular fault 2 If required the Customer Service Advisor will arrange for a qualified engineer to call 3 All products attended to by a Triton ser...

Отзывы: