113
107750-01 - 9/17
“Press”
System
Setup
button to access the following parameters:
Factory
Setting
Range /
Choices
Parameter and Description
Fahrenheit
Fahrenheit,
Celsius
Temperature Units
The Temperature Units parameter determines whether temperature is represented in units of Fahrenheit
or Celsius degrees.
Wired
Not Installed,
Wired
Wireless
Outdoor Sensor Source
Not Installed Outdoor Sensor is not connected to the boiler, the sensor is not monitored for faults.
Wired Outdoor Sensor is installed directly on the boiler terminal Strip.
Wireless Outdoor sensor is installed and wireless.
Enabled
Enable/Disable
Frost Protection
Disable Frost Protection is not used.
Enable Boiler and system circulators start and boiler fires when low outside air, supply and return
temperatures are sensed.
Disabled
Enable/Disable
Warm Weather Shutdown Enable
Disable Warm Weather Shutdown (WWSD) is not used.
Enable The boiler and pumps will not be allowed to start in response to a central heat call for heat if
the outside temperature is greater than the WWSD setpoint. WWSD is initiated as soon as
outside air temperature is above WWSD Setpoint. The control does not require call for heat
to be satisfied. The boiler will still start in response to a Domestic Hot Water call for heat.
70°F
0-100°F
Warm Weather Shutdown Setpoint*
The Warm Weather Shutdown (WWSD) Setpoint used to shutdown the boiler when enabled by the
“WWSD Enable” parameter.
*Only visible when warm weather shutdown is enabled.
XII. Operation
F. Changing Adjustable Parameters (continued)
2. Adjusting Parameters (continued)
The following pages describe the Control’s adjustable parameters. Parameters are presented in the order they appear on
the Control’s Display, from top to bottom and, left to right. From the “Home” screen select the Adjust button to access the
adjustment mode screens show below (if required, refer to the previous page to review how to enter Adjustment mode):
Содержание ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...