40
107750-01 - 9/17
Option #
35
36
37
38
39
40
Illustrated in Figure
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Roof
Roof
Roof
Intake
Wall
Wall
Wall
Wall
Wall
Wall
Material
Vent
Selkirk
Polyflue (Rigid/
Flex)
Selkirk
Polyflue (Rigid/
Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
DuraVent
FasNSeal
Flex
DuraVent
FasNSeal
Flex
Intake
PVC
PVC
PVC
PVC
Stainless
Steel
Stainless
Steel
Nominal Diameter
Vent
3"
4"
3"
4"
3"
4"
Intake
3" or 4"
4"
3" or 4"
4"
3"
4"
Min Equivalent Vent Length:
Model Sizes
320
30"
30"
30"
30"
30"
30"
399
30"
30"
30"
30"
30"
30"
Max Equivalent Vent Length (Note 1):
Model Sizes
320
60ft
135ft
60ft
135ft
60ft
135ft
399
50ft
135ft
50ft
135ft
50ft
135ft
Rigid Vent Terminals
Vent
Not Permitted
Intake
Flex Termination
& Components
(Masonry Chimney
Chase) (Note 3)
Vent
3PF-FLEX-KIT
3PF-FLEX
4PF-FLEX-KIT
4PF-FLEX
IFCK03**
IFCK04**
3FSFLEX-**
FSRC3
4FSFLEX-**
FSRC4
Intake
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
Flex Termination &
Components (B-Vent
Chimney Chase)
Vent
3PF-10UV or
3PF-39UV w/
Screen 3PF-
BVSC (Note 4)
4PF-10UV OR
4PF-39UV w/
Screen 4PF-
BVSC (Note 4)
IFBK03****
IFBK04****
Not Permitted
Intake
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
90 elbow w/
screen
VII. Venting
D. Design Requirements Unique to Split Vent Systems (continued)
* Specify size of B vent (e.g. 3PPS-BV
6
is for use with 6" B vent).
** Specify length in feet.
**** Specify Flex length and B vent diameter (e.g. IFBK03
2505
includes 25ft of flex and used with 5" B vent).
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length. See equivalent
lengths for flex vent shown in Figure 7.14 and sizing example on page 32.
Note 2: At least 30" of CPVC pipe, and at least one CPVC elbow, must be installed between the boiler's vent connection and
PVC pipe.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
ALL
must be unused.
Note 4: See vent manufacturer's installation manual for gaskets, spacers and other required vent components.
All vertical terminals require compatible roof flashing and storm collars.
Table 7.21: Summary of Split Vent System Options
(continued)
Содержание ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...