138
107750-01 - 9/17
XIV. Troubleshooting
(continued)
C. Help Screen Faults
D. Help Screen Diagnostic Features
Zone Panel
Failure
Flashing
Duplicate
Zone
Flashing
Indication
Condition
Possible Cause
Zone Panel
Setup
Flashing
Zone Panel 1
Setup
Flashing
Zone Panel 1 communication lost, typical for Panel 1 through 4: The zone panel’s
communication was established and then lost. Check the following to correct the
issue:
• Wiring between panel and boiler.
• Zone panel DIP switch settings have changed:
- Set Master/Slave switch to “Master”
- Set Zone Control switch ZC1 to “ON”
- Cycle power
Zone Panel Electronics Failure: A Zone Panel
Duplicate Zone: The Control has detected duplicate zone panel numbers. Check the
following to correct:
• Each Zone Control DIP Switch must be set to a Unique setting:
Note that when multiple ZC switches are set on ON the Zone Panel
is reported as Zone Panel 1.
Sequencer
Setup
Sequencer
Setup
Fault
This alarm is active if the slave boiler has lost communication with the Sequence
Master. Check the following:
- RJ 45 peer-to-peer network disconnected
- Sequencer Master was Enabled and then Disabled
- Master’s Boiler has been powered down.
- To clear fault restore communication or cycle power
Boiler Size
Setup
Boiler
Size
Fault
WARNING!
Boiler size setting may not match actual boiler size.
The Boiler size setting determines min, max and light-off blower speeds. Incorrect
boiler size can cause hazardous burner conditions and improper operation that may
result in PROPERTY LOSS, PHYSICAL INJURY, OR DEATH.
Refer to page 120 for boiler size setting instructions.
Indication
Possible Cause
Lockout History is stored in a first-in, first-out basis. Each History file is stored with boiler run hour of when the
lockout occurred.
The “When happened” and “Current” provide:
- “Current” is the run hour and status the boiler just finished.
- “When happened” is the run hour and status when the lockout occurred.
For Service Contact:
CONTRACTOR NAME
CONTRACTOR ADDRESS 1
CONTRACTOR ADDRESS 2
PHONE NUMBER
The user is given the contact information of the responsible service provider. Refer to page 128 for data entry
instructions.
Содержание ASPN-320
Страница 11: ...11 107750 01 9 17 IV Locating the Boiler continued Figure 4 1 Minimum Clearances To Combustible Construction ...
Страница 13: ...13 107750 01 9 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 88: ...88 107750 01 9 17 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 89: ...89 107750 01 9 17 Figure 10 5 Internal Wiring Ladder Diagram X Wiring continued ...
Страница 90: ...90 107750 01 9 17 X Wiring continued CONDENSATE FLOAT SWITCH ...
Страница 91: ...91 107750 01 9 17 X Wiring continued Figure 10 6 Internal Wiring Connections Diagram ...
Страница 100: ...100 107750 01 9 17 Operating Instructions XI Start Up and Checkout continued ...
Страница 145: ...145 107750 01 9 17 XV Service Parts continued ...
Страница 147: ...147 107750 01 9 17 XV Service Parts continued All Models ...
Страница 149: ...149 107750 01 9 17 XV Service Parts continued All Models ...
Страница 151: ...151 107750 01 9 17 XV Service Parts continued All models ...
Страница 157: ...157 107750 01 9 17 ...
Страница 158: ...158 107750 01 9 17 ...
Страница 159: ...159 107750 01 9 17 ...
Страница 160: ...160 107750 01 9 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...