SECTION IV PREPARATION FOR USE AND INSTALLATION
- 4-1 -
SECTION IV
4.
PREPARATION FOR USE AND INSTALLATION
INTRODUCTION
This section provides installation instructions for the Aspect A-2000 BIS Monitor, Digital
Signal Converter and accessories including:
•
Site preparation
•
Instrument connections
•
Installation and verification procedure
•
Repackaging for shipping and storage
4.1
ENVIRONMENT
4.1.1
Shipping and Storage Environment
The monitor and its accessories can be stored or shipped within the following
environmental limits. Note that these limits apply to non-operational storage and shipping
situations.
Temperature
-20
o
C to +60
o
C
Humidity
15 % to 95 % (non-condensing)
Pressure
360 mmHg to 800 mmHg
Protect the monitor from sudden temperature changes which can lead to condensation
within the instrument. To minimize condensation, avoid moving the system between
heated buildings and outside storage. Once moved inside, allow the monitor to stabilize
in the unopened shipping container at the inside ambient temperature before unpacking
and placing into service. Before operation, wipe down all visible condensation and allow
the system to reach equilibrium at room temperature.
4.1.2
Operating Environment
The A-2000 is not designed for use in areas containing flammable gases or vapors.
WARNING:
EXPLOSION HAZARD: DO NOT USE THE A-2000 IN A FLAMMABLE
ATMOSPHERE OR WHERE CONCENTRATIONS OF FLAMMABLE
ANESTHETICS MAY OCCUR.
Temperature
. The Aspect A-2000 Monitor is designed to operate safely at a room
temperature of 5 degrees C to 40 degrees C. Conditions that exceed these limits could
affect reliability.
Humidity
. The monitor is designed to operate within specifications at a relative non-
condensing humidity of 15% to 95%.
Pressure
. The monitor will operate satisfactorily at or above sea level, and is unaffected
by extremes or changes in altitude within atmospheric pressures of 360 mmHg to 800
mmHg.
Содержание BISPECTRAL INDEX A-2000
Страница 9: ...SECTION I INTRODUCTION 1 4 Figure 1 1 The A 2000 BIS Monitoring System...
Страница 11: ...SECTION I INTRODUCTION 1 6...
Страница 19: ...SECTION III PRINCIPLES OF OPERATION 3 2 Figure 3 1 The A 2000 System Block Diagram...
Страница 20: ...SECTION III PRINCIPLES OF OPERATION 3 3 Figure 3 2 The A 2000 Signal Flow Diagram...
Страница 35: ...SECTION V PREVENTIVE MAINTENANCE CARE AND CLEANING 5 6...
Страница 53: ...SECTION VI DIAGNOSTICS AND TROUBLESHOOTING 6 18...
Страница 59: ...SECTION VII DISASSEMBLING AND REASSEMBLING THE A 2000 7 6 Flange Figure 7 3 The Keypad Cable Tension Flange...
Страница 61: ...SECTION VII DISASSEMBLING AND REASSEMBLING THE A 2000 7 8 Figure 7 4 The Four Mounting Screws...
Страница 71: ...SECTION VII DISASSEMBLING AND REASSEMBLING THE A 2000 7 18 L bracket Figure 7 15 The L Bracket Installed...
Страница 76: ...SECTION VII DISASSEMBLING AND REASSEMBLING THE A 2000 7 23 Tie Wraps J 300 Figure 7 19 Battery and cable...
Страница 85: ...SECTION VIII A 2000 SPECIFICATIONS 8 4 8 3 Digital Signal Converter DSC Connector LEMO 5 female...
Страница 91: ......