Ashland AGP200 Series Скачать руководство пользователя страница 6

6

Electrical Connections

 

Turn circuit breaker off before

 

plugging or unplugging the

 

switch and/or pump.

 

 

Always rely upon a Certified Electrician for installation.

Piggy-Back Plug 

 Plug the  

level control plug into a  

6-20R receptacle, then plug  

the pump into the piggy-back  

plug (See Figure 2). It is  

recommended that this circuit

have a 30 AMP breaker. One  

cycle of operation should be 

observed, so that any potential 

problems can be corrected.

It is recommended that the level control float should be  

set to ensure that the liquid in the sump never drops  

below the top of the motor housing. The level control

should have adequate clearance so it cannot hang up in  

it’s swing and that the pump is completely submerged

when the level control is in the “Off ” mode. Minimum 

tether length is 3.50”. 
By adjusting the cord tether the control level can be 

changed. DO NOT USE THE POWER OR CONTROL  

CABLE TO LIFT PUMP.

Thermal Protection

On single phase models,the normally closed (N/C) over 

temperature sensor is embedded in the motor windings 

and will detect excessive heat in the event an overload 

condition occurs. The thermal sensor will trip when the 

windings become too hot and will automatically reset 

when the pump motor cools to a safe temperature. 
In the event of an over temperature, the source of this 

condition should be determined and repaired immediately. 

Thermal protection shall not be used as a motor overload 

device.

Grinder Pumps

Model: AGP200 Series

Receiving and Installation

For single phase the white lead exits the epoxy potting in 

the plate between the motor housing and cord cap, and 

is connected to terminal 5 on the relay. The black lead 

exits the potting and is connected to black power cord 

line via a butt connector. This connection is shared with 

a lead from the start capaciter and a lead from the run 

capacitor. The red lead exits the potting and is connected 

to terminal 2 on the relay, which is shared with a lead 

from the run capacitor. The remaining lead from the start 

capacitor is connected to terminal 1 on the relay (see 

Figure 6, page 11)
Note: Rotation should be clockwise when observed from 

the top of the pump. This can be checked by noting

which direction the pump torque is upon initial starting. 

A properly rotating pump will torque counterclockwise

upon start.  
The control cable has 3 conductors: black, white and 

green. Black and white connect to the seal failure leads, 

and the green connects to the ground screw (25).

Note:

 Each cable has a green ground wire and must be 

properly grounded per the National Electric Code and 

local codes.

Electrical Motor Controls:

 All electrical

controls and motor starting equipment

should be as specified in these instructions.

Pre-operation

CHECK VOLTAGE AND PHASE

Before operating pump, check to make sure that voltage 

and phase information stamped on the pump’s identifica-

tion plate matches the available power.

CHECK PUMP ROTATION

Before putting pump into service for the first time, the 

motor rotation must be checked. Improper motor rota-

tion can result in poor pump performance and

can damage the motor and/or pump.

IDENTIFICATION PLATE

Note the numbers on the pumps identification plate and 

record at the end of this manual for future reference.

FIGURE 2

Automatic

Manual

Содержание AGP200 Series

Страница 1: ...cture which ever comes first Obligation under this warranty is limited to repairing or replacing any part thereof which shall within one year be returned to us with transportation charges prepaid and...

Страница 2: ...contact with pumped fluid is possible Risk of electrical shock To reduce risk of electrical shock always disconnect pump from power source before handling Lock out power tag 2 Grinder Pumps Model AGP2...

Страница 3: ...Note All dimensions have a tolerance of 1 8 DESCRIPTION To reduce domestic sewage to finely ground slurry PHYSICAL DATA Discharge Size 1 1 4 NPT Impeller Type 10 Vane Vortex Brass Cable Length 35 LIQU...

Страница 4: ...9169 MARS 11068 MARS 12248 AGP200M6 35 2 60 208 3 20A 230V 3450 13 G SOW 12 AWG 65 N A N A N A AGP200M2 35 2 60 230 1 20A 230V 3450 17 G SOW 12 AWG 6 MARS 19169 MARS 11068 MARS 12248 AGP200M2E 35 2 60...

Страница 5: ...DO NOT require a control panel but do require a level control with a piggy back plug see Wiring Connections page 11 Recommended Submergence Level 241 9 1 2 Note Do not run dry FIGURE 1 Motor Single ph...

Страница 6: ...he epoxy potting in the plate between the motor housing and cord cap and is connected to terminal 5 on the relay The black lead exits the potting and is connected to black power cord line via a butt c...

Страница 7: ...ticles Milky white oil indicates the presence of water Oil level should be just above the motor when pump is in vertical position Oil Testing Drain oil into a clean dry container by placing pump on it...

Страница 8: ...reate a hazard Overfilling oil voids warranty Before any service work is done disconnect and lock out electrical power to pump Cutter Disassembly Lay pump on its side and remove the cutter retaining s...

Страница 9: ...ousing 16 being sure o ring 12 is not twisted and in the groove Place four capscrews 14 through holes in seal housing and into seal plate and torque to 6 5 ft lbs Outer Seal Clean and oil stationary s...

Страница 10: ...re usually installed in concrete or fiber glass basins with the lift out rail system Figure 5 shows pump mounted on the rail system Instructions for install ing rail system are furnished with rail pac...

Страница 11: ...make the installations 2 Three phase pumps instructions for wiring to control panel will be included with control panel All wires should be checked for shorts to ground with an ohmmeter or megger afte...

Страница 12: ...e for proper instalation and freedom of operation 7 Discharge head may be too high 7 Check elevation Red light comes on 1 This indicates some water has leaked 1 Change oil in seal chamber at control b...

Страница 13: ...emove and examine clogged causing low pump flow valves for proper Installation and freedom of operation 5 Pump may be air locked 5 Loosen union slightly to allow trapped air to escape Verify that turn...

Страница 14: ...44 45 44 46 47 49 39 13 NOTE 1 44 45 46 47 48 49 are optional 2 23 24 25 26 27 28 29 30 single phase models with integral capacitors and relay only 3 19 21 22 37 are optional Single Phase model or th...

Страница 15: ...USING ASSY 091AGP219 091AGP220 091AGP220 091AGP244 091AGP220 1 20 WAVE WASHER 6203 091AGP221 091AGP221 091AGP221 091AGP221 091AGP221 1 TERMINAL CONNECTOR CE 8 1Ph Model 208 230V 091AGP222 091AGP222 3...

Страница 16: ...16 1899 Cottage Street Ashland Ohio 44805 Telephone 855 281 6830 Fax 877 326 1994 ashlandpump com P U M P H o n e s t P r o f e s s i o n a l D e p e n d a b l e AP AGP200 OM 5 2016...

Страница 17: ...primero Obligaci n bajo esta garant a se limita a reparar o reemplazar cualquier parte del mismo que ser dentro de un a o ser devuelto a nosotros con cargos de transporte propagados y result ser defec...

Страница 18: ...go El c trico Nacional y todos los c digos estatales y locales apli cables Los requisitos pueden variar dependiendo del uso y ubicaci n La instalaci n y servicio es que ser realizado por personal cual...

Страница 19: ...cos SiC Cojinete superior 6203 Cojinete inferior 3207 Contacto angular 584 1 2 23 288 3 4 1 1 1 4 NPT FLANGE 8 1 4 3 8 95 3 3 4 584 1 2 23 288 3 4 11 3 8 206 8 1 8 153 1 4 6 103 4 1 1 4 NPT FLANGE 8 1...

Страница 20: ...MARS 11068 MARS 12248 AGP200M6 35 2 60 208 3 20A 230V 3450 13 G SOW 12 AWG 65 N A N A N A AGP200M2 35 2 60 230 1 20A 230V 3450 17 G SOW 12 AWG 6 MARS 19169 MARS 11068 MARS 12248 AGP200M2E 35 2 60 230...

Страница 21: ...l con un enchufe de leng eta consulte Conexiones de cableado p gina 11 Motor Los motores de la fase solos son proporciona con termosta tos sensor de calor conectados directamente a los devana dos del...

Страница 22: ...re la tapa de la caja del motor y el cable y se conecta al terminal 5 en el rel El conductor negro sale de la maceta y se conecta a la l nea de cable de ali mentaci n negro a trav s de un conector de...

Страница 23: ...bomba est en posici n vertical Pruebas de Petr leo Vaciar el aceite en un recipiente limpio y seco colocando la bomba en su lado Retire el tap n del tubo 15 desde la caja 19 Verifique el aceite de co...

Страница 24: ...puede destruir la bomba y crear un peligro Aceite de sobrellenado anula la garant a Antes de cualquier trabajo de manten imiento se realiza desconecte y bloquee la energ a el ctrica a la bomba Desmon...

Страница 25: ...el par a 6 5 pies libra Sello exterior Limpie y aceite estacionaria cavidad del sello en la placa de estanqueidad Deslice herramienta gu a sello sobre el eje del motor Engrase ligeramente No utilice g...

Страница 26: ...en las cuencas de hor mig n o de fibra de vidrio con el sistema ferroviario de troquelado La Figura 5 muestra la bomba montada en el sistema ferroviario Las instrucciones para instalar sistema ferrov...

Страница 27: ...icados deben hacer las instalaciones 2 Bombas trif sicas instrucciones para el cableado al panel de control se incluir n con el panel de control Todos los cables deben ser revisados para cortos a tier...

Страница 28: ...ontrol box completely down on handle may be damaged by lightning then back to ON position If breaker trips again in a few seconds check motor for lighting damage 1 El impulsor de la bomba puede ser ai...

Страница 29: ...eraci n 5 Afloje la uni n ligeramente para permitir que el aire atrapado escape Verifique que el nivel de corte del interruptor se ajusta de modo que la cavidad del rotor siempre se inunda Limpiar el...

Страница 30: ...44 46 47 49 39 13 NOTE 1 44 45 46 47 48 49 are optional 2 23 24 25 26 27 28 29 30 single phase models with integral capacitors and relay only 3 19 21 22 37 are optional Single Phase model or three Pha...

Страница 31: ...91AGP234 1 31 TERMINAL CONNECTOR 2 091AGP235 091AGP235 1 32 SCREW 3 8 16UNC 2 091AGP236 091AGP236 091AGP236 091AGP236 091AGP236 4 33 CORD CAP 091AGP237 091AGP237 091AGP237 091AGP237 091AGP237 1 34 WAS...

Страница 32: ...32 1899 Cottage Street Ashland Ohio 44805 Tel fono 855 281 6830 Fax 877 326 1994 ashlandpump com P U M P H o n e s t P r o f e s s i o n a l D e p e n d a b l e AP AGP200 OM 5 2016...

Страница 33: ...es graves MARKS AND MEANING AVERTISSEMENT Cette pompe est garantie exempt des d fauts de mat riaux et de fabrication et effectuer au sein des sp cifications applicables pour une p riode d une ann e la...

Страница 34: ...les blessures ou la mort r sultant du non respect de ces consignes de s curit l abus ou mauvaise utilisation de pompes ou de l quipement Tous les produits retourn s doivent tre nettoy s d sinfect s ou...

Страница 35: ...Taille de d charge 1 1 4 NPT Type de l Impelleur 10 Pale Tourbillon Laton Longueur du C ble 35 MANIPULATION DE LIQUIDE Taille des Solides 1 2 Temp rature du Liquid Maximal 140 F Intermittent 104 F Co...

Страница 36: ...169 MARS 11068 MARS 12248 AGP200M6 35 2 60 208 3 20A 230V 3450 13 G SOW 12 AWG 65 N A N A N A AGP200M2 35 2 60 230 1 20A 230V 3450 17 G SOW 12 AWG 6 MARS 19169 MARS 11068 MARS 12248 AGP200M2E 35 2 60...

Страница 37: ...ez pas la taille du tuyau de d charge inf rieur celui qui est pr vu sur lapompe Les deux un clapet d anti retour et une vanne d arr t sont recommand s pour chaque pompe Moteur Chaque moteur est fourni...

Страница 38: ...eur Pompes de Broyeuse Mod le AGP200 R ception et Installation Pour le monophas la c ruse sort de l enrobage poxy dans la plaque entre le carter du moteur et le bouchon de cordon et est reli e la born...

Страница 39: ...che inspectez visuellement l huile dans le carter 19 pour vous assurer qu il est propre et claire ambre p le et exempte de particules en suspension L Huile blanche laiteuse indique la pr sence d eau L...

Страница 40: ...gereuse qui peut d truire la pompe et cr er un risque L Huile remplissage excessif annule la garantie Avant tout travail de service est fait d connectez et ver rouillez l alimentation lectrique la pom...

Страница 41: ...ue l anneau d O 12 ne soit pas tordu et dans la gorge Placez les quatre vis 14 travers des trous dans le bo tier d tanch it et dans la plaque d tanch it et le torque 6 5 ft lbs Joint Ext rieur Nettoye...

Страница 42: ...ns le puisard Ces pompes sont g n ralement install es dans des bas sins en b ton ou en fibre de verre avec le syst me du railde levage La figure 5 mentre la pompe mont e sur le syst me du rail Les ins...

Страница 43: ...ohmm tre ou m gohmm tre apr s que les connexions sont faites Cela est IMPORTANT comme un fil de mise la terre peut provoquer une d faillance de la pompe le panneau de contr le ou des blessures 208 23...

Страница 44: ...amaged by lightning then back to ON position If breaker trips again in a few seconds check motor for lighting damage Pompes de Broyeuse Mod le AGP200 Meurtre de Probl me ATTENTION 1 impelleur de la po...

Страница 45: ...umul autour des flotteurs provo quant que la pompe ne fonctionne pas correctement 1 Passez l op rateur automa tique 2 D connectez le contr le de niveau R glez l ohmm tre pour une gamme basse telle que...

Страница 46: ...4 46 47 49 39 13 NOTE 1 44 45 46 47 48 49 are optional 2 23 24 25 26 27 28 29 30 single phase models with integral capacitors and relay only 3 19 21 22 37 are optional Single Phase model or three Phas...

Страница 47: ...CONNECT CORD 2 091AGP232 091AGP232 1 29 RING 2 091AGP233 091AGP233 1 30 RUN CAPACITOR 091AGP234 091AGP234 1 31 TERMINAL CONNECTOR 2 091AGP235 091AGP235 1 32 SCREW 3 8 16UNC 2 091AGP236 091AGP236 091AG...

Страница 48: ...48 1899 Cottage Street Ashland Ohio 44805 T l phone 855 281 6830 Fax 877 326 1994 ashlandpump com P U M P H o n n t e P r o f e s s i o n n e l F i a b l e AP AGP200 OM 5 2016...

Отзывы: