9 CALIBRATION,
cont.
5)
Generator Power Calibration
- Use an external reference voltmeter to measure the generator
voltage at the generator terminals located on TB12-1, 2, 3, 4. To enter the meter calibration
screen, press and hold the
GENERATOR POWER
(3) button down for 7 seconds, or until the
calibration display appears, then release the button. Use the
GENERATOR POWER
(3) button
to move the cursor to the voltage phase to be calibrated. Calibrate the selected parameter by
pressing the
F1
button to increment and the
F2
button to decrement the displayed value. When
all displayed values equal the values measured by the reference meter, pressing the
SYSTEM
STATUS
(5) button will store the new calibration values and return the display to the System
Status display. Press the
GENERATOR POWER
(3) button to verify proper shore power meter
calibration.
NOTE: Calibration of the Generator Metering Display is required only when the Seamless
Transfer option is installed
Содержание AC36V-1
Страница 15: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE...
Страница 16: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 CONTROLS...
Страница 34: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 34 6 5 REMOTE COMMUNICATIONS cont FIGURE 7 RS 232C PINOUT...
Страница 56: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 56 8 DIAGNOSTICS cont FIGURE 8 STATUS WORD BIT DEFINITIONS...