![ASEA AC36V-1 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/asea/ac36v-1/ac36v-1_operation-manual_2981676024.webp)
AC36V-1, -3 / AC45V-1, -3 / AC54V-1, -3 Operations Manual....
24
6.1
POWER TURN-ON PROCEDURE, cont.
The display will sequence to the SUMMARY DISPLAY indicating the converter’s operational state.
Both input and output (converter) should indicate OFFLINE at this time. Press the
INFO
(13)
button to review the Shore Power state if desired. The INFO screen will either list the Shore Power
as ONLINE or give a reason for its being off if it was previously on. A press of the
F3
(13) button
in the INFO screen will display the last known converter failure. Return to the SUMMARY
DISPLAY at any time by pressing the
SYSTEM STATUS
(5) button.
At this time both of the red LED indicators next to the
OFF
buttons (10A & 11A) should be lit. If
the system has been ordered with the Seamless Transfer option, and the generator is on-line, the
green LED (12A) to the left of the
GENERATOR
(12) button will be lit.
Press the
SHORE POWER
(2) display button. The display will indicate basic shore power
information: voltage, current, and kVA. Press the
F2
(13) button to view kW, Power Factor,
frequency, and form. Verify the displayed voltages indicate the expected voltages and frequency. If
not, do not proceed until contacting factory personnel. Additional SHORE POWER information can
be obtained by pressing the
F3
and
F4
(13) buttons: peak currents and crest currents, percent of
system rating, and kVAR. Return to the primary screen by pressing the
F1
(13) button.
SUMMARY DISPLAY AC36 MASTER
INPUT: OFFLINE CONVERTER: OFFLINE
LOAD LEVEL: 0.0 % AUTO-RESTART: ON
INFO STATUS
INPUT #1 PHASE A-B PHASE B-C PHASE C-A
VOLTAGE: 208V 208V 208V
CURRENT: 0A 0A 0A
LOAD: 0.0 kVA 0.0 kVA 0.0 kVA
Содержание AC36V-1
Страница 15: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 15 5 1 MECHANICAL INSTALLATION cont FIGURE 2 MECHANICAL OUTLINE...
Страница 16: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 16 5 1 MECHANICAL INSTALLATION cont FIGURE 3 CONTROLS...
Страница 34: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 34 6 5 REMOTE COMMUNICATIONS cont FIGURE 7 RS 232C PINOUT...
Страница 56: ...AC36V 1 3 AC45V 1 3 AC54V 1 3 Operations Manual 56 8 DIAGNOSTICS cont FIGURE 8 STATUS WORD BIT DEFINITIONS...