Software Upload
This Chapter describes the software uploading procedure for AIP 6350 and
Office 35IP.
AIP and IP terminals implement software which has to be adapted in the course
of the product's further development (application software). The latest applica-
tion software can be loaded on to the terminals using the AIMS Upload Manager.
7.6.1 Upload
Process
The Upload process for IP terminals is described below. The Upload process for
AIP cards follows the same pattern:
• Initialization phase:
From the Upload Manager select the IP terminals to be loaded with the new
application software. Start the Upload: the Upload Manager copies the soft-
ware file to the PBX's FTP storage medium (Fig. 13; [1]) or to an external FTP
server and initiates the Upload process on the first terminal [2].
• Execution phase:
The IP terminal retrieves the software file from the FTP server of the PBX [3] or
from an external FTP server, loads it into its memory [4] and restarts the termi-
nal, which in turn activates the new application software.
• Monitoring:
The Upload Manager checks and registers the Upload status during the execu-
tion phase; once one IP terminal has been fully updated, the Upload Manager
triggers the same process for the next IP terminal.
The Upload is completed once all the IP terminals have been loaded with the new
software and restarted.
Содержание Ascotel AIP 6350
Страница 1: ...ascom Ascotel IntelliGate Telecommunication System a AIP 6350 Office 35IP System Manual...
Страница 2: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...by ascom Order No 20326473 Version en_hbg_000_a0...