![Asada BOLT MACHINE 25Pro Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/asada/bolt-machine-25pro/bolt-machine-25pro_instruction-manual_2980159013.webp)
4. OPERATION
• The following gives a general description of threading work.
(1) Prepare for operation. Check threading oil.
(2) Change the size of the thread as required.
(3) Install the workpiece on this machine.
(4) Thread the workpiece.
(5) Remove the threaded workpiece.
The following describes the contents of the above procedures.
1) Preparing for Operation
1-1)
Checking Threading Oil
• A new machine or a machine not used for a long period of time is coated with rust preventive oil.
Wipe it off with a piece of clean cloth.
(1) Turn Rack Handle clockwise to move Spindle Case to the left side.
(2) Fill the provided threading oil from the right side of the machine. ( fig.3)
(3) Make sure the machine is switched off and plug Power Plug into receptacle. A two-core
receptacle must always be grounded.
(4) Switch on the machine and make sure the threading oil flows from Oiling Pipe.
(5) Oil Tank capacity is 10L.
For heavy use, recommend to add more oil than standard (4L) for much efficient cooling.
Rack Handle
Fill Threading Oil
〈
3
〉
12