
Chapter 4
AXP1440 Installation and Use (6806800H23U)
79
AXP1440 Operations
4.1
Overview
This chapter provides the basic operating procedures for the AXP1440. For software-specific
information, or information regarding the operation of third-party or add-on components,
please refer to the software or hardware product’s vendor documentation. You can refer to
Appendix A, Related Documentation
for a collection of supporting manuals.
This chapter covers the following topics:
Recommended Power-On Procedures
Recommended Power-Off Procedures
Emergency Power-Off Procedures
4.2
Recommended Power-On Procedures
Procedure - Power-On System
Follow these steps to power-on your AXP1440.
1. Verify that all shelf modules and associated data and control cables are properly
configured and installed. Make sure that all empty or unused slots contain an
approved filler panel.
2. Enable DC power at each external source (branch circuit or power distribution unit).
3. Push the circuit breakers to the ON position. They are located on the front of each
PEM.
Содержание AXP1440
Страница 1: ...AXP1440 Installation and Use P N 6806800H23U October 2018...
Страница 8: ...6 AXP1440 Installation and Use 6806800H23U Contents...
Страница 10: ...List of Figures 8 AXP1440 Installation and Use 6806800H23U...
Страница 12: ...List of Tables 10 AXP1440 Installation and Use 6806800H23U...
Страница 20: ...AXP1440 Installation and Use 6806800H23U About this Manual 18 About this Manual...
Страница 79: ...Site Preparation AXP1440 Installation and Use 6806800H23U 77 Figure 3 4 Planning Checklist 2...
Страница 80: ...Site Preparation 78 AXP1440 Installation and Use 6806800H23U...
Страница 108: ...AXP1440 Shelf Installation 106 AXP1440 Installation and Use 6806800H23U...
Страница 152: ...Shelf Management Alarm Module 150 AXP1440 Installation and Use 6806800H23U...
Страница 155: ...1...