
FRU Installation
AXP1440 Installation and Use (6806800H23U)
111
7. Fully insert the RTM and lock it to the shelf by pressing the two components of the
lower and the upper handles together and turning the handles toward the face plate.
8. Tighten both face plate screws on the RTM.
9. Insert the front blade from the system's front into the same slot as the RTM.
As soon as the front blade is connected to the backplane, the blue hot swap
LEDs of both the front blade and the RTM are illuminated permanently. This
indicates that the IPMC of the front blade and the MMC of the RTM are
powered up.
10. Close the handles of the front blade.
The blue LEDs on both the front blade and the RTM start flashing. This
indicates that the front blade is informing the shelf manager about its desire
to power up the payload of both the front blade and the RTM.
11. Tighten the two face plate screws on the front blade.
12. Wait until the blue LEDs on both the front blade and the RTM are OFF.
Switched off blue LEDs indicate that the payload of the respective blade or
RTM has become active.
13. Plug interface cable into face plate connectors, if applicable.
Содержание AXP1440
Страница 1: ...AXP1440 Installation and Use P N 6806800H23U October 2018...
Страница 8: ...6 AXP1440 Installation and Use 6806800H23U Contents...
Страница 10: ...List of Figures 8 AXP1440 Installation and Use 6806800H23U...
Страница 12: ...List of Tables 10 AXP1440 Installation and Use 6806800H23U...
Страница 20: ...AXP1440 Installation and Use 6806800H23U About this Manual 18 About this Manual...
Страница 79: ...Site Preparation AXP1440 Installation and Use 6806800H23U 77 Figure 3 4 Planning Checklist 2...
Страница 80: ...Site Preparation 78 AXP1440 Installation and Use 6806800H23U...
Страница 108: ...AXP1440 Shelf Installation 106 AXP1440 Installation and Use 6806800H23U...
Страница 152: ...Shelf Management Alarm Module 150 AXP1440 Installation and Use 6806800H23U...
Страница 155: ...1...