10
5. Retest the alarm after at least 4 hours. Allow the
alarm to operate for 2 minutes to ensure that it has
been adequately recharged.
6. If the alarm does not operate for 2 minutes, call the
service engineer.
Continue to use the pump only under supervision to
ensure that the power-on status is checked at regular
intervals
.
All other alarms will continue to function as normal.
Deflating the
Mattress
To deflate and store the mattress, switch off the pump
and remove the tube-set at the pump end. Ensure the
transport facility on the tube-set is set to normal mode
and roll up the mattress, starting at the end furthest from
the tube-set.
Содержание NIMBUS
Страница 1: ...Instructions For Use Product Photo NIMBUS PEDIATRIC STSTEM ...
Страница 2: ......
Страница 4: ... ii ...
Страница 30: ...24 ...
Страница 32: ...631990US_03 September 2010 ...