9
Inflating the Mattress
1. Insert the power plug into the power socket.
2. Switch the pump
ON/OFF
switch to ON; the
ON
light on the front panel should illuminate.
3. The pump will now run a self test for
approximately 3 seconds when all lights will be
illuminated.
4. If the pump detects low pressure it will enter an
inflation sequence with the
WAIT
message
illuminated.
Once normal operating pressure has been reached, the
WAIT
light will switch off. It may take up to 20 minutes
to fully inflate the pediatric mattress replacement.
Testing the Power
Fail Alarm
The power fail alarm is powered by a rechargeable
battery.
The duration of the alarm will depend on the level of
charge in the battery.
In use, it may have become discharged or reached the
end of its life. It is therefore recommended that the alarm
be tested before use.
1. Connect the pump to the mains, switch on and
allow to run for 10-15 seconds.
2. Remove the power at the wall socket without
switching the pump off.
3. The alarm should operate within 10 seconds.
4. If the alarm does not operate, run the pump for 4
hours to recharge the battery.
Caution
If the power fail alarm does not operate after this test, only use the
pump under supervision to ensure that the power-on status is
checked at regular intervals.
Route the power cable so that it cannot be damaged or be
hazardous to the caregiver or visitor.
Содержание NIMBUS
Страница 1: ...Instructions For Use Product Photo NIMBUS PEDIATRIC STSTEM ...
Страница 2: ......
Страница 4: ... ii ...
Страница 30: ...24 ...
Страница 32: ...631990US_03 September 2010 ...