background image

ARITERM SWEDEN AB

 

 

 

Installation, Operation and Maintenance - 2007.10.26- 3/12

 DIMENSIONS / ITEMS INCLUDED IN THE DELIVERY

TECHNICAL SPECIFICATION

Performance

Capacity range, pellets

Capacity, electricity

Hot water production

20 kW

6 kW
480 l +40°C/40 min (12 l/min)

Dimensions

Dimensions (width x depth x height)

Weight

Water contents

606 x 717 x 1500 mm

220 kg

140 l

Design values and settings

Design pressure, boiler

Design pressure, cw-hw

Design temperature

Recommended draught

0,5-1,5 bar

max 10 bar
120 °C
20 Pa

Connections

Heating system

Hot water

Expansion

Drain

Flue

Flue pipe recommendation

DN 25 male

Cu Ø 22 mm

DN 25 male

DN 15 female

Ø 102 mm

Ø 100 mm, height min 5 m

Power supply

Mains supply

Mains cable

Fuse size

Connection capacity

400 V, 50 Hz

MMJ 4x1,5s

3x10 A

6000 W

 

Standard delivery 

 

• Shunt valve ESBE TM 20 
• Flow switch 

 

• Sweeping gear
• Adjustable feet  

 

• Drain tap DN 15
• Chimney connection piece L = 140 (embedded in chimney)

 Accessories 

• Draught limiter
• Oil-burner door
• Combination fl ue for horizontal and vertical installation (part no. 5206)

 

Biomatic 20

1.  Drain, hot water return line, DN 15

2.  Flue connection Ø 102

3.  Shunt opening for additional circuit

4.  Expansion DN 25 male

5.  Shunt openings

  a) Feed line Cu 22 / DN 20

  b) Return line Cu 22 / DN 20

6.  Cold water inlet Cu 22

7.  Hot water outlet Cu 22

8.  Cable bushing

9.  Sweeping hatch

10. Ash box

11. Flame observation

A-dimensions including comb.

fl

 ue pipe is app. 1710 mm

389

2

4

5b

5a

6

8

7

3

9

1

10

Höjdmått gäller exkl ställbara fötter

606

1500

261

130

157

49

55

758

214

305

62

100

410

213

Ø 102 utv.

A=1460

725

1019

425

180

11

620

157

Ø114

Kombinationsrökrör

Ø114

50

Dimensions are without adjustable feet

Comb. 

fl

 ue pipe

Содержание Biomatic 20

Страница 1: ...ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 1 12 INSTALLATION OPERATION AND MAINTENANCE Biomatic 20 ...

Страница 2: ...term retailer The retailer supplies required spare parts and authorized service man makes the necessary adjustments and combustion gas analysis when replacing spare parts Guarantee This boiler manufactured by Ariterm AB is guaranteed to be free of defects in work manship and materials for a period of 24 months 2 years from the date of installati on The manufacturer shall not be held liable for fau...

Страница 3: ...city 400 V 50 Hz MMJ 4x1 5s 3x10 A 6000 W Standard delivery Shunt valve ESBE TM 20 Flow switch Sweeping gear Adjustable feet Drain tap DN 15 Chimney connection piece L 140 embedded in chimney Accessories Draught limiter Oil burner door Combination flue for horizontal and vertical installation part no 5206 Biomatic 20 1 Drain hot water return line DN 15 2 Flue connection Ø 102 3 Shunt opening for ad...

Страница 4: ...t exchanger 2 Internal circulation pump Biomatic the new generation pellet boiler is specially designed for pellet burning to reduce the formation of soot layers on the convection surfaces as far as possible the boiler is equipped with upright convection tubes Biomatic is equipped with an oversized ash pan to facilitate care and maintenance Sweeping primarily takes place from the soot hatch on top...

Страница 5: ...ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 5 12 WIRING DIAGRAM ...

Страница 6: ... not be covered 30 Mortar Flue pipe 30 mm incom bustible insulation Imbedment into chimney ATTENTION The chimneysweep must be notied for inspection of the flue CAUTION The boiler has low flue gas temperatures which under certain conditions might lead to condensation of flue gases 1 Operating thermostat electric heating element Selection of operating temperature of electric heating element 2 Overhe...

Страница 7: ...rried out in accordance with current local and national hot water and building regulations Safety equipment shall be installed in accordance with regulations in force If a closed expansion vessel is used an approved safety valve a pressure gauge and a vent valve shall be fitted The safety valve shall be fitted just above but not directly on the boiler in such a manner that the connection with the bo...

Страница 8: ...spection shall be carried out check that the heating system is filled and bled check that the circulation pump is working check that the system valves are open check that the automatic control and safety devices if any are in working order check that the chimney has the necessary draught and that the fresh air ventilation is open WATER PIPING FILLING OF WATER Before you begin heating the heating sy...

Страница 9: ...als available on the market that are suitable for pellets manufacture These raw materials have various characteristics that can be advantageous or disad vantageous for pelletised fuel Important factors that can be assessed are energy content size amount of fines moisture content and last but not least the price We recommend that you choose the fuel that has the lowest cost per energy unit after che...

Страница 10: ...to know that the minimum bulk delivery is normally 3 tons if you wish to avoid freight surcharge 1 ton of pellets corresponds to about 1 6 m3 To accommodate 3 tons of pellets you would need a store of at least 6 m3 to have some space to spare Inspection hatch 600 x 600 mm Store pipe delivered by Ariterm see previous page The whole length of the store pipe shall be supported 2 x horizontal studs 45...

Страница 11: ...emperature boiling risk If these instructions are not followed during installation operation and maintenance the obligations of Ariterm AB under the warranty regulations are no longer binding Ariterm reserves the right to alter any details and specifications without prior notice Flue gas temp High CO Retailer Installer Installed by Inst date O2 CO2 Efficiency Draught mm Fan Effect Flue gas temp Lo...

Страница 12: ...ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Отзывы: