background image

ARITERM SWEDEN AB

 

 

 

Installation, Operation and Maintenance - 2007.10.26- 6/12

 

INSTALLATION

 

CONTROL PANEL

Th

  e boiler shall be positioned and installed according to the building rules in force. 

Minimum clearance in front of the boiler (burner included) is 1000 mm. Clearence 

on the top and at least by the other side of the boiler shall be at least 0,5 m. Th

 e boiler 

must be level. If the fl oor is uneven, adjustments can be made with the help of four 

adjusting bolts (enclosed with the boiler) that shall be fi tted to the bottom plate of the 

boiler. Th

  e air intake duct to the boiler room must have at least the same area as the 

fl ues.

 

Chimney installation

To embed the angular tube in the chimney, proceed according to the drawing below. 

If the tube is embedded as described, you will be able to avoid soot leakage when the 

chimney is being swept. 

 

Flue connection and combustion air intake

Th

  e combination fl ue of the boiler allows for connection towards the top as well 

as to the rear. Boiler cement is suitable for sealing. Recommended fl ue gas require-

ments: brick chimney lined with a Ø 100 mm acid proof thin-walled tube or an acid 

proof    Ø 100 mm element chimney. Recommended underpressure in the chimney 

is 20 Pa. Th

  e height of the gas fl ue shall be dimensioned according to the building’s 

requirements, but should be at least 5 m. If condensation water comes out of the fl ue, 

a condensate drain pan shall be installed in the lower portion of the chimney. Th

 e 

combustion air intake must not be covered.

30

Mortar

Flue pipe

30 mm incom-
bustible
insulation

Imbedment into chimney

ATTENTION! The chimneysweep must  

be notied for inspection of the 

fl

 ue. 

CAUTION! The boiler has low 

fl

 ue gas 

temperatures, which, under certain 

conditions,might lead to condensation 

of 

fl

 ue gases.

 

1. Operating thermostat – electric heating element

 

Selection of operating temperature of electric heating element

 

2. Overheat protection – electric heating element

 

Press this button to reset overheat cut-out. Before reset, check that there is water in  

 

the boiler and that the operating thermostat works correctly. If you cannot reset the  

 

overheat protection, please contact a qualied installation contractor.

 

3. Operating thermostat – burner

 

Selection of operating temperature of pellet burner

 

4. Overheat protection – pellet burner

 

Press this button to reset overheat cut-out. Before reset, check that there is water in  

 

the boiler and that the operating thermostat works correctly. If you cannot reset the  

 

overheat protection, please contact a qualied installation contractor.

 5. 

Th

  ermometer / Pressure gauge

 

Display water pressure and water temperature at the top of the boiler. Due to the  

 

stratication of water, boiler temperature varies considerably within the boiler; the  

 

lowest water temperature is measured at the bottom and the highest at the top.

 

6. Flue gas thermometer

  

Displays temperature of leaving ue gases at the ue connection point.

 

7. Operation indicator – electric heating element

 

Indicates when electric heater is turned on.

 

8. Switch - heat exchanger circulation pump

 

Press this button for continuous pump operation (to increase hot water capacity  

 

during electric heater operation).

6

1

5

7

2

3

4

8

Содержание Biomatic 20

Страница 1: ...ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 1 12 INSTALLATION OPERATION AND MAINTENANCE Biomatic 20 ...

Страница 2: ...term retailer The retailer supplies required spare parts and authorized service man makes the necessary adjustments and combustion gas analysis when replacing spare parts Guarantee This boiler manufactured by Ariterm AB is guaranteed to be free of defects in work manship and materials for a period of 24 months 2 years from the date of installati on The manufacturer shall not be held liable for fau...

Страница 3: ...city 400 V 50 Hz MMJ 4x1 5s 3x10 A 6000 W Standard delivery Shunt valve ESBE TM 20 Flow switch Sweeping gear Adjustable feet Drain tap DN 15 Chimney connection piece L 140 embedded in chimney Accessories Draught limiter Oil burner door Combination flue for horizontal and vertical installation part no 5206 Biomatic 20 1 Drain hot water return line DN 15 2 Flue connection Ø 102 3 Shunt opening for ad...

Страница 4: ...t exchanger 2 Internal circulation pump Biomatic the new generation pellet boiler is specially designed for pellet burning to reduce the formation of soot layers on the convection surfaces as far as possible the boiler is equipped with upright convection tubes Biomatic is equipped with an oversized ash pan to facilitate care and maintenance Sweeping primarily takes place from the soot hatch on top...

Страница 5: ...ARITERM SWEDEN AB Installation Operation and Maintenance 2007 10 26 5 12 WIRING DIAGRAM ...

Страница 6: ... not be covered 30 Mortar Flue pipe 30 mm incom bustible insulation Imbedment into chimney ATTENTION The chimneysweep must be notied for inspection of the flue CAUTION The boiler has low flue gas temperatures which under certain conditions might lead to condensation of flue gases 1 Operating thermostat electric heating element Selection of operating temperature of electric heating element 2 Overhe...

Страница 7: ...rried out in accordance with current local and national hot water and building regulations Safety equipment shall be installed in accordance with regulations in force If a closed expansion vessel is used an approved safety valve a pressure gauge and a vent valve shall be fitted The safety valve shall be fitted just above but not directly on the boiler in such a manner that the connection with the bo...

Страница 8: ...spection shall be carried out check that the heating system is filled and bled check that the circulation pump is working check that the system valves are open check that the automatic control and safety devices if any are in working order check that the chimney has the necessary draught and that the fresh air ventilation is open WATER PIPING FILLING OF WATER Before you begin heating the heating sy...

Страница 9: ...als available on the market that are suitable for pellets manufacture These raw materials have various characteristics that can be advantageous or disad vantageous for pelletised fuel Important factors that can be assessed are energy content size amount of fines moisture content and last but not least the price We recommend that you choose the fuel that has the lowest cost per energy unit after che...

Страница 10: ...to know that the minimum bulk delivery is normally 3 tons if you wish to avoid freight surcharge 1 ton of pellets corresponds to about 1 6 m3 To accommodate 3 tons of pellets you would need a store of at least 6 m3 to have some space to spare Inspection hatch 600 x 600 mm Store pipe delivered by Ariterm see previous page The whole length of the store pipe shall be supported 2 x horizontal studs 45...

Страница 11: ...emperature boiling risk If these instructions are not followed during installation operation and maintenance the obligations of Ariterm AB under the warranty regulations are no longer binding Ariterm reserves the right to alter any details and specifications without prior notice Flue gas temp High CO Retailer Installer Installed by Inst date O2 CO2 Efficiency Draught mm Fan Effect Flue gas temp Lo...

Страница 12: ...ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Отзывы: