![Arista 7300 Series Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/arista/7300-series/7300-series_quick-start-manual_2970767003.webp)
Contents
Contents
Chapter 1: Overview................................................................................1
1.1 Scope...................................................................................................................................... 1
1.2 Receiving and Inspecting the Equipment............................................................................... 1
1.3 Installation Process.................................................................................................................1
1.4 Safety Information...................................................................................................................2
1.5 Obtaining Technical Assistance............................................................................................. 2
1.6 Specifications.......................................................................................................................... 3
Chapter 2: Preparation............................................................................9
2.1 Site Selection..........................................................................................................................9
2.2 Tools Required for Installation............................................................................................. 10
2.3 Electrostatic Discharge (ESD) Precautions.......................................................................... 11
Chapter 3: Rack Mounting the Switch................................................ 13
3.1.1 Attaching Mounting Brackets to the Chassis.......................................................... 13
3.1.2 Inserting the Switch into the Rack..........................................................................14
3.2.1 Component Description...........................................................................................15
3.2.2 Component Placement............................................................................................17
3.2.3 Switch Mounting Process....................................................................................... 17
Chapter 4: Powering the Modular Switch........................................... 23
4.2.1 DC Power Supplies.................................................................................................25
4.2.2 Wire and Lug Preparation...................................................................................... 26
4.2.3 PWR-3K-DC-Blue Power Supply............................................................................ 28
Chapter 5: Connecting Serial and Management Cables....................31
5.1 Connecting Supervisor Cables............................................................................................. 31
5.2 Connecting Linecard Modules and Cables...........................................................................32
Chapter 6: Configuring the Switch...................................................... 33
Appendix A: Status Indicators............................................................. 35
A.1 Supervisor Module............................................................................................................... 35
A.2 Line Card Module Indicators................................................................................................ 36
iii
Содержание 7300 Series
Страница 2: ......
Страница 16: ...12 ...
Страница 26: ...22 ...
Страница 34: ...30 ...
Страница 54: ...50 ...
Страница 58: ...54 ...
Страница 60: ...DCS 7308 and DCS 7328 Rear Panel 1 ESD grounding port 2 Fabric modules 3 Fan modules 56 ...
Страница 61: ...Rear Panels DCS 7316 Rear Panel 1 ESD grounding port 2 Fabric modules 3 Fan modules 4 Power Supply Modules 57 ...
Страница 62: ...58 ...
Страница 66: ...62 ...