Aria-24
ipe
Digital Key Telephone System
Installation Manual
Issue 1.5
Aria Technologies
76
Section 7. Starting the Aria-24ipe System
7.1 Before starting the Aria-24ipe System
1.
The DIP switch (SW1) of memory backup Battery should be turned ON before the MBU
installation to protect system data in the case of a power failure.
2.
Set the DIP switch (SW3) on the MPU to ON.
-. To initialize all the data in Admin programming, the 4th pole of SW3 should be set ON.
3.
Plug the AC power cord into the Aria-24ipe System and AC outlet.
4.
Program the country code.
5.
Make a reset of the Aria-24ipe System.
6.
Set the 4th pole of SW3 on the MBU/MBUB to OFF when the system operates normally.
-. The 4th pole of SW3 should be OFF to protect the variety features by Admin programming
after the system power up and initialization.
7.2 Basic preprogramming
The Aria-24ipe System can be programmed to meet each customer's individual need.
This section contains the following topics :
Before ADMIN programming
Button explanation
How to enter the programming mode
Permanent update procedure
How to reset the system