Page 3
1. RECEIPT OF THE INSTRUMENT & START UP
Check that the configuration of the instrument (as indicated on the case bottom label) corresponds to your order.
Mount the instrument on a DIN rail.
Connect the power supply (see the wiring diagrams). The tension LED lights up.
The instrument now starts to measure, it has a standard configuration (except specific indications on your order).
The instrument can now be programmed, preferably before connecting the measure signals.
Now connect all the signals: see the wiring diagrams.
If not specified, the communication parameters for the PC software or the digital output are the following:
slave number = 250
speed = 9600 bauds
without parity
1 stop bit
2. ORGANISATION OF THE FRONT FACE
IN CASE OF PROBLEM …
If the instrument does not light up:
Check the presence of power supply (even for a self-powered instrument).
If the instrument does not measure:
Check the presence of the measure signals.
Check the programming.
If the green LED is blinking:
The instrument is detecting an error, connect the console or the PC software for
the analysis.
DIN rail
ON:
Visualisation of the setting on tension /
error
COM:
Visualisation of the communications
REL:
Visualisation of the relays status
Connectics for the programming
micro-console / shifted display.
DIN plug: PC connection
D
O
N
O
T
D
IS
M
O
U
N
T
T
H
E
F
R
O
N
T
F
A
C
E
IF
T
H
E
M
E
A
S
U
R
E
S
IG
N
A
L
S
A
N
D
T
H
E
P
O
W
E
R
S
U
P
P
L
Y
A
R
E
C
O
N
N
E
C
T
E
D
Содержание TAI60
Страница 3: ...Page 2 U US SE E ...
Страница 7: ...Page 6 P PR RO OG GR RA AM MM MI IN NG G ...
Страница 14: ...Page 13 T TE EC CH HN NI IC CA AL L F FE EA AT TU UR RE ES S ...
Страница 18: ...Page 17 W WI IR RI IN NG G ...