
Figure. 7.2 - 233. Application example and its connections.
7.3 Two-phase, three-wire ARON input connection
This chapter presents the two-phase, three-wire ARON input connection for any AQ-200 series IED
with a current transformer. The example is for applications with protection CTs for just two phases. The
connection is suitable for both motor and feeder applications.
A
AQ
Q-F213
-F213
Instruction manual
Version: 2.04
393
Содержание AQ-F213
Страница 1: ...AQ F213 Feeder protection IED Instruction manual ...
Страница 399: ...Figure 7 4 239 Example block scheme A AQ Q F213 F213 Instruction manual Version 2 04 398 ...
Страница 421: ...Figure 8 14 262 Panel cutout dimensions and device spacing A AQ Q F213 F213 Instruction manual Version 2 04 420 ...