ARCA Regler GmbH
15 Retrofit / exchange / repair
Series 824
41 / 46
09.2018 / 1.0
▪ Remove the circlip (18).
▪ Loosen the screws (19).
▪ Remove the piston lever (8).
▪ Mount the new piston lever (8).
▪ Further installation in the reverse order.
▪ For commissioning see
[13]
Commissioning
.
15.7
Complete diaphragm chamber
▪ Dismount the piston lever (8) in accordance with the chapter
[15.6]
Piston lever
.
▪ Loosen the screws (12).
▪ Remove the diaphragm chamber (9).
▪ Mount the new diaphragm chamber (9).
▪ Further installation in the reverse order.
▪ For commissioning see
[13]
Commissioning
.
15.8
Control piston bushing and wire
▪ Dismount the diaphragm chamber (9) in accordance with the chapter
[15.7]
Complete diaphragm chamber
.
▪ Pull out the control piston (7).
▪ Remove the bayonet clip (5) and protective cap (4).
▪ Pull the control bushing downwards (2).
▪ Mount the new control bushing (2) and new control piston (7) with a
new control wire (62).
▪ Further installation in the reverse order.
▪ For commissioning see
[13]
Commissioning
.
Содержание 824 series
Страница 1: ...Operating manual Electro pneumatic positioners Series 824 09 2018 1 0...
Страница 2: ...Original instructions ARCA Regler GmbH All rights reserved Cover picture background Freepik com...
Страница 14: ...6 Exploded view ARCA Regler GmbH 14 46 Series 824 09 2018 1 0 6 Exploded view Illustration 2 Detail drawing...
Страница 23: ...ARCA Regler GmbH 9 Installation Series 824 23 46 09 2018 1 0 Illustration 6 Pivot lever...
Страница 26: ...9 Installation ARCA Regler GmbH 26 46 Series 824 09 2018 1 0 Illustration 9 Adapter plate pivot lever...
Страница 46: ...www arca valve com...