PRESSURIZING

 

 

1.

 

Put the bypass system in 'bypass' position. 

2.

 

Make  sure  the  electronic  controller(s)  of  the  water 
softener is (are) in service mode. 

3.

 

Open the mains water supply. 

4.

 

Open  a  cold  treated  water  faucet  nearby  the  water 
softener and let the water run for a few minutes until all 
air  is  purged  and  all  foreign  material  that  may  have 
resulted from the installation is washed out; close the tap. 

5.

 

Gently  pressurize  the  water  softener,  by  putting  it  into 
service: 

 

close the 'BYPASS' valve; 

 

open the 'OUT' valve; 

 

slowly open the 'IN' valve. 

6.

 

After  2-3  minutes,  open  a  cold  treated  water  faucet 
nearby the water softener and let the water run for a few 
minutes until all air is purged from the installation and the 
resin bed is rinsed (it is normal for the rinse water to show 
some discoloration!); close the tap. 

7.

 

Check  the  water  softener  and  all  hydraulic  connections 
for leaks. 

8.

 

For

 

Duplex/Triplex

:  repeat  steps  5-7  for  all  Simplex 

systems. 

 

ELECTRONIC CONTROL PANEL 

 
9.

 

Program the electronic controller. 

10.

 

For Duplex/Triplex

: repeat step 9 for all Simplex systems. 

 

ADJUSTMENT RESIDUAL HARDNESS 

 

ON CONTROL VALVE 
 

  

Picture 10

 

11.

 

Adjust the residual hardness of the water that leaves the 
softener, by means of the adjusting screw, incorporated 
at the right side of the control valve: 

 

to raise the residual hardness: turn the screw counter 
clockwise; 

 

to  reduce  the  residual  hardness:  turn  the  screw 
clockwise. 

 

WITH FACTORY BYPASS (optional) 
 

  

Picture 11

 

12.

 

Adjust the residual hardness of the water that leaves the 
softener, by means of the adjusting screw, incorporated 
in the 'outlet' valve of the factory bypass: 

 

to raise the residual hardness: turn the screw counter 
clockwise. 

 

to  reduce  the  residual  hardness:  turn  the  screw 
clockwise. 

 
 
 
 
 
 
 
 
 

INITIATE A REGENERATION 

 

13.

 

Manually initiate a regeneration, by pressing the 

scroll

 

 

button repeatedly until the display shows:  

 
 
 

14.

 

Leave the water softener in this position; the count-down 
timer will count down to 0 sec and start a regeneration; 
to save time you may skip, or terminate prematurely, the 
second cycle of the regeneration by pressing the 

scroll

 

 

button  once,  as  soon  as  the  display  indicates  that  the 
system is in the second regeneration position. 

15.

 

For  Duplex/Triplex

:  repeat  steps  12-13  for  all  Simplex 

systems. 

 

DUPLEX/TRIPLEX:  

INTERCONNECT CABLE(S) 

 

  

Picture 12

 

16.

 

Connect the control valves to each other by means of the 
InterConnect  cable(s);  simply  plug  the  DIN  plugs  on  the 
InterConnect cable(s) in the DIN sockets at the back of the 
electronic timer of each control valve (

). 

 

DUPLEX ALTERNATING:  

INITIATE ALTERNATING MODE 

 
17.

 

On  1  of  the  2  control  valves,  manually  initiate  a 
regeneration, by pressing the 

scroll

 

 button repeatedly 

until the display shows:  

 
 
 

18.

 

Leave the water softener in this position; the count-down 
timer will count down to 0 sec and start a regeneration. 

19.

 

Press  the 

scroll

 

  button  repeatedly,  to  advance  the 

control valve through the regeneration cycles and put it 
in Standby mode, until the display shows: 

 
 
 

Regen in 10 sec 

Regen in 10 sec 

Stdby   1000 L - 

Содержание ProFlow

Страница 1: ...2014 Aquion Inc TM EN ProFlow Rev2014 04 Technical Manual WATER SOFTENER...

Страница 2: ...Troubleshooting Page 20 Electrical wiring diagrams Page 22 Default parameter settings Page 24 Composition overview Page 25 Exploded view Simplex Tempo Eco Page 26 Exploded view Duplex Eco Alternating...

Страница 3: ...rtaken by a competent person aware of the local codes in force All plumbing and electrical connections must be done in accordance with local codes Before setting up the water softener make sure to che...

Страница 4: ...oiler house or freezing temperatures can occur the water softener cannot be exposed to outdoor elements such as direct sunlight or atmospheric precipitation do not install the water softener too close...

Страница 5: ...on Furthermore in case of a Duplex system both Simplex systems share 1 brine tank that contains 2 brine valves During normal operation all Simplex systems are in service doubling tripling the service...

Страница 6: ...ove the lid from the brine tank 13 Run the polytube from the brine valve through the hole in the sidewall of the brine tank to the outside of the brine tank 14 Insert the polytube into the brine line...

Страница 7: ...ort of the control valve 4 Connect the OUT valve of the 3 valve bypass system to the adaptor on the out port of the control valve 5 Connect the mains water supply to the inlet of the 3 valve bypass sy...

Страница 8: ...ecure it by means of a clamp 3 Run the drain hose to the air gap and connect it to one of the hose barbs secure it by means of a clamp This drain line operates under pressure so it may be installed hi...

Страница 9: ...wise WITH FACTORY BYPASS optional Picture 11 12 Adjust the residual hardness of the water that leaves the softener by means of the adjusting screw incorporated in the outlet valve of the factory bypas...

Страница 10: ...n the event of a timer failure the display will show the message In such case entering one of the programming levels can possibly solve the problem However if the problem persists professional service...

Страница 11: ...up at low speed to reduce its noise level To increase the speed of the drive motor simply press the scroll button as soon as the drive motor is activated PROGRAMMING INSTRUCTIONS INSTALLER Before ent...

Страница 12: ...requirements of the installation SIMPLEX TEMPO 1 Press the scroll button and hold it for 5 sec until the display shows 2 Within 10 sec press the up button the display will show Press the up or down bu...

Страница 13: ...Immd when the remaining capacity equals the reserve capacity a delayed regeneration at the programmed time of regeneration is started however when the remaining capacity equals 0 before the programme...

Страница 14: ...Press the scroll button again the display will show Press the up or down button to set the volume of resin 5 Press the scroll button again the display will show Press the up or down button to set the...

Страница 15: ...y will show Press the up or down button to set the regeneration mode Immediate when the remaining capacity equals 0 an immediate regeneration is started Dlyd Immd when the remaining capacity equals th...

Страница 16: ...splay shows the average daily water usage Capacity display shows the calculated volume of softened water between regenerations Hardness display shows the setting of the water hardness Rsrv display sho...

Страница 17: ...r conditioner salt inside the brine tank is kept between 1 3 and 2 3 A lower level of water conditioner salt can cause insufficient brine saturation resulting in a loss of softening capacity A higher...

Страница 18: ...HYDRAULIC FLOW DIAGRAMS Page 18 SERVICE BACKWASH BRINE DRAW SLOW RINSE FAST RINSE REFILL...

Страница 19: ...Page 19...

Страница 20: ...Replace PCB Defective drive motor Replace drive motor Water softener uses too much salt Excessive water in brine tank Refer to problem Excessive water in brine tank Water softener regenerates too freq...

Страница 21: ...ain line Verify drain line for kinks or restrictions Restricted brine line Verify brine line for kinks or restrictions Leak in brine line Verify brine line and connections for air leakage No water in...

Страница 22: ...RAMS Page 22 SIMPLEX TEMPO position switches power lead drive motor service valve Normally Open optional key pad SIMPLEX ECO position switches flow meter power lead drive motor service valve Normally...

Страница 23: ...ATING position switches flow meter power lead drive motor service valve Normally Closed InterConnect socket key pad DUPLEX TRIPLEX ECO PARALLEL position switches flow meter power lead drive motor serv...

Страница 24: ...Eco Resin 25 50 75 100 125 150 Hardness unit 1 f f f f f f Exchange capacity per liter resin f M3 L 1 2 5 5 5 5 5 5 5 5 5 5 5 5 Resin liters 25 50 75 100 125 150 Override days 7 7 7 7 7 7 Cycle 1 BACK...

Страница 25: ...C 10x35 2 125 ltr 1 1 2 2 x 50 35664 2400VS L1KD ALT 2 1 2 x NC 12x48 2 275 ltr 1 1 4 2 x 75 35665 2400VS L1LD ALT 2 1 2 x NC 13x54 2 500 ltr 1 1 6 2 x 100 35666 2400VS L2MD ALT 2 1 2 x NC 14x65 2 500...

Страница 26: ...EXPLODED VIEW SIMPLEX TEMPO ECO Page 26...

Страница 27: ...X Control valve Eco 75 Ltr 2400VS J2MD AUX Control valve Eco 100 Ltr 2400VS J2ND AUX Control valve Eco 125 Ltr Eco 150 Ltr 7 568 303 1 Connection kit 1 male 8 H1015 2 Brine line polytube std length is...

Страница 28: ...EXPLODED VIEW DUPLEX ECO ALTERNATING Page 28...

Страница 29: ...le 10 74069 InterConnect cable 11 H1015 2 Brine line polytube std length is 2 mtr to be ordered per meter 12 38519 Brine line filter 13 H1016 2 Brine well cap top 14 DM A6EU6 Quick fit elbow 3 8 15 38...

Страница 30: ...EXPLODED VIEW DUPLEX ECO PARALLEL Page 30...

Страница 31: ...10 74069 InterConnect cable 11 H1015 2 Brine line polytube std length is 2 mtr to be ordered per meter 12 38519 Brine line filter 13 H1016 2 Brine well cap top 14 DM A6EU6 Quick fit elbow 3 8 15 3853...

Страница 32: ...EXPLODED VIEW TRIPLEX ECO PARALLEL Page 32...

Страница 33: ...Open 9 74089 Brass adaptor 1 male 10 H1015 2 Brine line polytube std length is 2 mtr to be ordered per meter 11 38519 Brine line filter 12 H1016 2 Brine well cap top 13 DM A6EU6 Quick fit elbow 3 8 1...

Страница 34: ...EXPLODED VIEW TIMER HEAD SIMPLEX Page 34...

Страница 35: ...ate 8 2100 206 Drive shaft 9 15 222 Screw drive motor assy 2x 10 28 245 4 Cable clamp 11 71502 Strain relief power lead 12 72261 Drive motor 13 568 227 2 Worm 14 19 48 Retaining ring 15 70965 Switch c...

Страница 36: ...EXPLODED VIEW TIMER HEAD DUPLEX ALTERNATING Page 36...

Страница 37: ...late 9 2100 206 Drive shaft 10 15 222 Screw drive motor assy 2x 11 28 245 4 Cable clamp 12 71502 Strain relief power lead 13 74105 Socket cable assembly ALT InterConnect 14 72261 Drive motor 15 568 22...

Страница 38: ...EXPLODED VIEW TIMER HEAD DUPLEX TRIPLEX PARALLEL Page 38...

Страница 39: ...late assembly with socket cable assembly PRL InterConnect 9 2100 206 Drive shaft 10 15 222 Screw drive motor assy 2x 11 28 245 4 Cable clamp 12 71502 Strain relief power lead 13 72261 Drive motor 14 5...

Страница 40: ...EXPLODED VIEW VALVE BODY Page 40...

Страница 41: ...mpeller Eco 19 72544 Impeller Eco 20 72545 Hub impeller Eco 21 185 007 6 O ring mixing valve 22 568 406 Mixing valve 23 186 118 O ring sleeve 24 568 407 L Sleeve mixing valve 25 568 385 2 B Refill flo...

Страница 42: ...ity per kg salt m x d 21 Service flow rate 1 bar pressure drop ltr min 3 56 57 58 58 62 60 Rinse water usage per regeneration ltr 165 285 400 540 670 780 Model Simplex Resin 25 50 75 100 125 150 Brine...

Страница 43: ...base cover mm 470 540 470 540 575 685 575 685 800 875 800 875 Brine tank height mm 850 850 975 975 1 110 1 110 Tank control valve depth mm 405 410 436 463 513 513 Tank control valve height mm 1 059 10...

Страница 44: ...AQUION INC Lammerdries Oost 30c B 2250 Olen Belgium 32 0 14 28 51 71 32 0 14 28 51 70 RPR RPM Turnhout BWT TVA VAT BE 0882 738 206 infobelgium eriewatertreatment com www eriewatertreatment com...

Страница 45: ...2013 Aquion Inc PP ProFlow Rev2014 01 r 1 2 a 2 b 3 a 3 b...

Страница 46: ...2013 Aquion Inc PP ProFlow Rev2014 01 r 4 a 4 b r 5 a 5 b...

Страница 47: ...2013 Aquion Inc PP ProFlow Rev2014 01 6 7 a 7 b r 8 a 8 b...

Страница 48: ...2013 Aquion Inc PP ProFlow Rev2014 01 r 9 10 r 11 r 12...

Страница 49: ...2013 Aquion Inc PP ProFlow Rev2014 01 13 14 a 14 b 14 c...

Страница 50: ...2013 Aquion Inc PP ProFlow Rev2014 01 15...

Страница 51: ...2013 Aquion Inc PP ProFlow Rev2014 01...

Страница 52: ...2013 Aquion Inc PP ProFlow Rev2014 01...

Отзывы: