Page - 22
1.5.e Three-Phase Adjustment
DANGER
Failure to heed the following will result in injury or death.
l
RISK OF ELECTRICAL SHOCK FROM ENERGY STORED IN CAPACITORS - MODELS EQUIPPED
WITH VARIABLE FREQUENCY COMPRESSOR DRIVES STORE ELECTRICITY EVEN AFTER THE
POWER HAS BEEN DEACTIVATED AT THE POWER BREAKER.
Wait for 2 minutes after the shut down
of equipment before servicing.
l
Deactivate power while routing wiring to control board.
l
Follow all National Electric Codes (NEC) and/or State and Local guidelines.
WARNING
Failure to heed the following may result in injury or death.
l
The information contained in this section is intended for use by qualified technicians, familiar with electrical
service-industry safety standards and methods.
If a three-phase unit fails to operate at start-up, the orientation of the line voltage "field" wiring may need to be
adjusted.
l
The phase monitor is located inside the electrical panel.
Three-Phase
Monitor
1. Deactivate power to the unit.
Confirm that power is off to all three legs using an
electrical test meter set for the correct voltage.
2. Switch position of the incoming power wires at each leg as follows, re-connect power and
attempt to restart the unit. If the unit fails to start, disconnect power. Verify off and proceed to
the next leg.
l
Switch incoming power wires at L1 and L2 on the line side to the contactor.
l
Switch incoming power wires at L1 and L3 on the line side to the contactor.
l
Switch incoming power wires at L2 and L3 on the line side to the contactor.
3. When heat pump starts, disconnect power and verify off. Then confirm all line voltage
connections are securely tightened. Reconnect power.
l
If the heat pump does not start, contact AquaCal
®
for further assistance.
1.5.f Schematic Location
Schematics are located on the inside of the electrical panel.
1
-
Ins
ta
ll
at
ion
Содержание HeatWave SuperQuiet SQ120R
Страница 2: ......
Страница 28: ...Page 24 Configure Call Flex Enter Installer Menus then proceed 1 Installation ...
Страница 33: ...Page 29 Configure for Smart Bus Controller Enter Installer Menus then proceed 1 Installation ...
Страница 36: ...Page 32 Configure 2 wire controller Enter Installer Menus then proceed 1 Installation ...
Страница 40: ...Page 36 1 Installation ...
Страница 41: ...Page 37 Configure for Scheduled Mode Enter Installer Menus then proceed 1 Installation ...
Страница 42: ...Page 38 1 Installation ...
Страница 45: ...Page 41 1 Installation ...
Страница 47: ...Page 43 1 Installation ...
Страница 50: ...Page 46 1 Installation ...
Страница 53: ...Page 49 1 Installation ...
Страница 55: ...Page 51 1 Installation ...
Страница 58: ...Page 54 Turbo Boost 1 Installation ...
Страница 59: ...Page 55 Set Efficiency Mode to 24 Hour 1 Installation ...
Страница 60: ...Page 56 Set Efficiency Mode to Filtration Schedule 1 Installation ...
Страница 61: ...Page 57 1 Installation ...
Страница 63: ...Page 59 1 Installation ...
Страница 65: ...Page 61 1 Installation ...
Страница 84: ...Page 80 Model Number Example 3 Appendix ...
Страница 89: ......
Страница 144: ...Rev L 8 12 13 MASTERTEMP Pool and Spa Heater Installation and User s Guide 55 N TES ...