21
No. Designation
1
Counter plate
2
Seed drill
3
Soil tillage implement
Procedure
To attach the seed drill on a soil tillage implement:
Step
Description
1
Fasten the counter plate (1) on the soil tillage implement (3).
The counter plate must be parallel to the ground.
2
Use the lifting gear to place the seeder (2) on the counter plate (1).
3
Fasten the seeder (2) with bolts and nuts on the counter plate (3).
4.2
Attaching the seed drill to a tractor
Purpose
For operation on the field, the seed drill can be attached directly to a tractor.
Requirements
The following requirement must be fulfilled for this work step:
•
The implement is disconnected from the power source, see
Disconnecting the
seed drill from the power source
On page 41.
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Suitable component for attachment (e.g. top link mounting kit, pallet fork or
three-point loader)
Bolts M 12, strength class 8.8 or higher
Self-locking fastenings (nuts)
•
Lifting gear that is suitable for the mass of the respective implement version, see
Technical Data
On page 11 for more information
Содержание PS 300 M1 D
Страница 48: ...48 10 2 Connection diagram...
Страница 59: ...59 Notes...