background image

 

 

12 

7.3

 

SETTINGS AND WORKING WITH THE IMPLEMENT 

Before beginning operation, the following must be performed: 

  Check bolted connections for firm seating 

  Relubricate the bearing  

  Check the mechanical integrity of all components 

 

The  recommended  working  speed  is  max.

 

8 km/h.  On  stony  soils,  a  lower  speed  should  be  selected; 

otherwise, the roller rings can break. The maximum transport speed is 25 km/h. 

 

8

 

MAINTENANCE AND CARE 

8.1

 

GENERAL MAINTENANCE INSTRUCTIONS 

To maintain the implement in good condition even after a long service life, the following instructions must 
be observed: 
 

  In Point 5, you will find some basic safety regulations for maintenance work. 

  Original parts and accessories are designed especially for the machines or implements. 

  Please note that spare parts and accessories not supplied by us have also not been tested and 

approved by us. 

  The installation or use of such products can therefore possibly negatively change or impede the 

constructional properties of your implement. The manufacturer rules out any liability for damages 
resulting from the use of non-original parts and accessories. 

  The manufacturer is not liable for any unauthorised modifications and the use of components and 

auxiliary parts. 

  CAUTION!  Liquids  escaping  under  high  pressure  can  penetrate  the  skin.  For  this  reason,  a 

physician must be consulted immediately in case of accident!!! 

  After  cleaning,  lubricate all  of the grease  points  and  distribute the grease  evenly  in  the  bearing 

points (e.g. perform a short test run). 

  Do not use a high pressure cleaner to clean bearing and hydraulic parts. 

  The paint can be damaged by cleaning with excessive pressure. 

  During  the  winter,  the  implement  should  be  protected  against  rust  with  an  environmentally-

friendly product. 

  Park the implement protected from weather conditions. 

8.2

 

REGULAR MAINTENANCE INSTRUCTIONS 

  All bolted connections should be re-tightened at the latest after 3 operating hours and again after 

20 hours, and then checked regularly (loose bolts can cause significant consequential damage, 
which is not covered by the warranty). 

  The  grease  points  on  the  joints  and  bearings  must  be  lubricated  regularly  (approx.  every  10 

operating hours with universal grease). 

  For implements with fast coupler, the guide slots must also be lubricated. 

  The platform kit and its access ladder must be visually inspected on a regular basis. 

  The rubber for fastening the access ladder of the platform kit must be checked regularly for wear 

and  replaced  if  necessary.  It  should  only  be  replaced  by  trained  specialist  personnel  and  with 
original parts.  

8.3

 

REPAIRS AND SERVICE 

In case of failure or damage to the implement, please contact the manufacturer. The contact data can be 
found in chapter 3. 

 

 

Содержание GW 250 M1

Страница 1: ...GRASSLAND ROLLER GW 250 M1 GW 300 M1 OPERATING MANUAL PLEASE READ CAREFULLY BEFORE INITIAL OPERATION Version 1 2 EN item number 00601 3 206 Translation of the original operating instructions...

Страница 2: ...8 2 Regular maintenance instructions 12 8 3 Repairs and service 12 9 INFORMATION ON NATURE CONSERVATION AND ENVIRONMENTAL PROTECTION 13 10 TECHNICAL DATA 13 11 ROAD TRANSPORT 13 11 1 Transport on pub...

Страница 3: ...3 15 6 Sensor set GPSa linkage sensor top link 19 16 SPARE PARTS 19 17 INDEX 20...

Страница 4: ...00 GW 250 M1 Serial number s as of 06015 01000 GW 250 M1 Serial number s as of 06016 01000 GW 250 M1 Serial number s as of 06017 01000 GW 300 M1 Serial number s as of 06018 01000 GW 300 M1 Serial numb...

Страница 5: ...ou still have questions regarding the handling of this implement despite the information provided in this operating manual For questions regarding spare parts To order maintenance and repair work Serv...

Страница 6: ...nted implement and is designed and built for use in agricultural operations It is used to prepare the soil for subsequent tillage and use Any other use is considered to be non intended The manufacture...

Страница 7: ...cified devices Special care must be taken when coupling and uncoupling implement to and from the tractor When mounting and dismounting put the support devices in their respective positions Stability A...

Страница 8: ...the tractor and the implement must match or be adapted There is a risk of injury due to crushing and shearing points in the area of the three point linkage Do not stand between the tractor and the imp...

Страница 9: ...st be clean and dry during use It is strictly forbidden to stand on the platform or its access ladder while driving When not in use the ladder must be folded up and secured An ascent must be establish...

Страница 10: ...pacity At least 20 of the empty vehicle weight is required on the front axle The lifting links must be adjusted to the same height on the left and on the right Mount the implement on the 3 point linka...

Страница 11: ...T 2 three point linkage CAUTION In a lowered state driving in curves is not permitted 7 2 IMPLEMENT LAYOUT Figure 6 1 Platform kit accessories 2 PS MD mounting kit accessories 3 Lighting incl warning...

Страница 12: ...pressure can penetrate the skin For this reason a physician must be consulted immediately in case of accident After cleaning lubricate all of the grease points and distribute the grease evenly in the...

Страница 13: ...390 478 kg 564 kg Ground adaptation Minimal adaptation thanks to flexible roller rings Roller types Cambridge roller d 530 mm Cambridge roller d 390 mm Toothed ring roller d 410 mm Minimum tractor pe...

Страница 14: ...ractor must be loaded with at least 20 of the net weight of the tractor The necessary ballast weight as well as the actual axle loads can be determined using the following formulas Specifications Figu...

Страница 15: ...ual rear axle load TH tat Now enter the calculated actual rear axle load and the permissible rear axle load specified in the tractor operating manual in the table under Point 11 4 6 Tyre load capacity...

Страница 16: ...2 13 2 STORAGE OF THE IMPLEMENT The implement must be stored in a dry place protected from weather conditions to ensure that it remains functional even if it is stored for a longer period of time The...

Страница 17: ...quently and therefore work less aggressively and reduce the seed quantity Reseeding can be performed in the spring as soon as the soil has warmed up a little The soil must have good trafficability i e...

Страница 18: ...0 with 6 outlets MD 06014 2 008 for GW250 with 8 outlets PS 06017 2 004 for GW300 with 6 outlets MD 06017 2 005 for GW300 with 8 outlets PS Figure 11 Symbolic image 15 4 MOUNTING KIT FOR PNEUMATIC SEE...

Страница 19: ...ectly through our online spare parts catalogue To do so scan the QR code with your smartphone you will be taken directly to our online spare parts catalogue Please keep your product number serial numb...

Страница 20: ...ntended use 6 Lighting 16 Maintenance 8 12 Mounted implements 8 Mounting on the tractor 10 Nature conservation and environmental protection 13 operating manual 9 Plug and cable assignment 16 Recyclabl...

Страница 21: ...21 NOTES...

Страница 22: ...22 NOTES...

Страница 23: ...23 NOTES...

Страница 24: ...APV Technische Produkte GmbH HEADQUARTERS Dallein 15 AT 3753 H tzelsdorf Tel 43 2913 8001 Email office apv at www apv at...

Отзывы: