background image

 

 

  Cleaning  is  recommended  as  specified  in  the  maintenance  instructions.  The  procedure  in  in 

maintenance instruction must be observed and protective equipment must be used.  

  Working under the implement is forbidden. 

  The implements must be checked regularly by the operator (before every use) for any fractures 

and cracks, chafe marks, leaks, loose bolts and connections, vibrations, unusual sounds, and to 
ensure they function correctly. 

  During assembly, the operator must ensure that the requirements for the tractor in terms of the 

power, axle loads and weight distribution as specified in the operating manual are met and that 
the connections specified in the operating instructions are made correctly. 

  When  performing  the  work  passes,  the  tractor's  speed  must  maintained  as  specified  in  the 

operating instructions. This can be between 6 and 15 km/h. 

  Additional lighting (e.g., flashlight) should be used for repair or maintenance work if necessary. 

  When implement parts are moving (e.g. during the folding or pre-tensioning procedure) it must be 

ensured  that  there  is  no  one  standing  in  the  danger  zone  of  the  implement 

– there is  a risk  of 

crushing.  

  When  driving  through  low  or  narrow  obstacles  (e.g.  power  lines,  underpasses,  etc.),  attention 

must be paid to the height and width of the implement to avoid collisions. 

  In case of loss or breakage of implement parts, they must be immediately replaced with original 

parts by trained specialist personnel. 

5.3

 

MOUNTED IMPLEMENTS 

  Before mounting  and  dismounting  implements  on  the  three-point  linkage,  the  operating  devices 

must be moved into the position that excludes unintentional lifting or lowering!

 

  For three-point mounting, the mounting categories of the tractor and the implement must match 

or be adapted!

 

  There is a risk of injury due to crushing and shearing points in the area of the three-point linkage!

 

  Do not stand between the tractor and the implement when actuating the external controls for the 

three-point mounting!

 

  When the implement is in transport position, always ensure that the tractor three-point linkage is 

sufficiently locked to the sides!

 

  When  driving  on  roads  with  the  implement  lifted,  the  operating  lever  must  be  locked  against 

lowering!

 

  When  mounting  the  implement,  the  operator  must  ensure  that  there  is  a  metallic  connection 

(ensured by the lower link) made to the tractor.  

  The operator must ensure that no one is standing in the vicinity of the implement when it or  its 

components are being moved by the tractor's hydraulic system. Visual check by the driver! 

  Mounting  of  any  sort  of  accessories  onto  the  implement  must  be  performed  according  to 

standards.  

5.4

 

MAINTENANCE 

  Maintenance, repair, and cleaning work as well as the elimination of malfunctions should always 

be performed when the drive is switched off and the motor is at a standstill (remove the ignition 
key) and the implement is uncoupled from the towing vehicle!  

  The  maintenance  work  itself  may  only  be  performed  by  trained  specialist  personnel  and  may 

never be performed alone. 

  Extreme  caution  must  be  taken  when  changing  defective  components  or  tools.  Replacing 

components  that  cannot  be  removed  with  tools  such  as  a  screwdriver  or  wrench  may  only  be 
replaced by specialist personnel from an appropriately authorised company or by APV Customer 
Service. 

  If  repairs  or  maintenance  are  required  on  the  implement  that  can  only  be  performed  in 

conjunction  with  the  towing  vehicle,  this  work  must  be  identified  by  a  clearly  visible  information 
sign "Caution: maintenance work".  

  Check the nuts and bolts regularly for tight fit and retighten if necessary! 

Содержание GW 250 M1

Страница 1: ...GRASSLAND ROLLER GW 250 M1 GW 300 M1 OPERATING MANUAL PLEASE READ CAREFULLY BEFORE INITIAL OPERATION Version 1 2 EN item number 00601 3 206 Translation of the original operating instructions...

Страница 2: ...8 2 Regular maintenance instructions 12 8 3 Repairs and service 12 9 INFORMATION ON NATURE CONSERVATION AND ENVIRONMENTAL PROTECTION 13 10 TECHNICAL DATA 13 11 ROAD TRANSPORT 13 11 1 Transport on pub...

Страница 3: ...3 15 6 Sensor set GPSa linkage sensor top link 19 16 SPARE PARTS 19 17 INDEX 20...

Страница 4: ...00 GW 250 M1 Serial number s as of 06015 01000 GW 250 M1 Serial number s as of 06016 01000 GW 250 M1 Serial number s as of 06017 01000 GW 300 M1 Serial number s as of 06018 01000 GW 300 M1 Serial numb...

Страница 5: ...ou still have questions regarding the handling of this implement despite the information provided in this operating manual For questions regarding spare parts To order maintenance and repair work Serv...

Страница 6: ...nted implement and is designed and built for use in agricultural operations It is used to prepare the soil for subsequent tillage and use Any other use is considered to be non intended The manufacture...

Страница 7: ...cified devices Special care must be taken when coupling and uncoupling implement to and from the tractor When mounting and dismounting put the support devices in their respective positions Stability A...

Страница 8: ...the tractor and the implement must match or be adapted There is a risk of injury due to crushing and shearing points in the area of the three point linkage Do not stand between the tractor and the imp...

Страница 9: ...st be clean and dry during use It is strictly forbidden to stand on the platform or its access ladder while driving When not in use the ladder must be folded up and secured An ascent must be establish...

Страница 10: ...pacity At least 20 of the empty vehicle weight is required on the front axle The lifting links must be adjusted to the same height on the left and on the right Mount the implement on the 3 point linka...

Страница 11: ...T 2 three point linkage CAUTION In a lowered state driving in curves is not permitted 7 2 IMPLEMENT LAYOUT Figure 6 1 Platform kit accessories 2 PS MD mounting kit accessories 3 Lighting incl warning...

Страница 12: ...pressure can penetrate the skin For this reason a physician must be consulted immediately in case of accident After cleaning lubricate all of the grease points and distribute the grease evenly in the...

Страница 13: ...390 478 kg 564 kg Ground adaptation Minimal adaptation thanks to flexible roller rings Roller types Cambridge roller d 530 mm Cambridge roller d 390 mm Toothed ring roller d 410 mm Minimum tractor pe...

Страница 14: ...ractor must be loaded with at least 20 of the net weight of the tractor The necessary ballast weight as well as the actual axle loads can be determined using the following formulas Specifications Figu...

Страница 15: ...ual rear axle load TH tat Now enter the calculated actual rear axle load and the permissible rear axle load specified in the tractor operating manual in the table under Point 11 4 6 Tyre load capacity...

Страница 16: ...2 13 2 STORAGE OF THE IMPLEMENT The implement must be stored in a dry place protected from weather conditions to ensure that it remains functional even if it is stored for a longer period of time The...

Страница 17: ...quently and therefore work less aggressively and reduce the seed quantity Reseeding can be performed in the spring as soon as the soil has warmed up a little The soil must have good trafficability i e...

Страница 18: ...0 with 6 outlets MD 06014 2 008 for GW250 with 8 outlets PS 06017 2 004 for GW300 with 6 outlets MD 06017 2 005 for GW300 with 8 outlets PS Figure 11 Symbolic image 15 4 MOUNTING KIT FOR PNEUMATIC SEE...

Страница 19: ...ectly through our online spare parts catalogue To do so scan the QR code with your smartphone you will be taken directly to our online spare parts catalogue Please keep your product number serial numb...

Страница 20: ...ntended use 6 Lighting 16 Maintenance 8 12 Mounted implements 8 Mounting on the tractor 10 Nature conservation and environmental protection 13 operating manual 9 Plug and cable assignment 16 Recyclabl...

Страница 21: ...21 NOTES...

Страница 22: ...22 NOTES...

Страница 23: ...23 NOTES...

Страница 24: ...APV Technische Produkte GmbH HEADQUARTERS Dallein 15 AT 3753 H tzelsdorf Tel 43 2913 8001 Email office apv at www apv at...

Отзывы: