Chapter 2
Unpacking and Setting Up the Instrument
Uncrating and Placing the 7300/7500/7500 Fast System
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide
13
Notes
2
Placing the System Components
1.
On the outside of the instrument crate, examine
these indicators:
• Tilt indicator (lower portion of crate), which
indicates if the crate has been severely tilted
• Shock indicator (upper portion of crate),
which indicates if the crate has been
subjected to excessive force
If either of these devices indicate tilt or shock
effects, perform the remaining steps in this
procedure, then visually inspect all contents of
the crate:
• If any items are damaged, contact Applied
Biosystems.
• If no items are damaged, continue with the
installation.
2.
Cut the straps securing the instrument crate.
3.
Cut the tape securing the top flaps of the
instrument crate and open them.
4.
Remove the Packing Kit from the instrument and
set it aside.
5.
Lift and remove the lid from the instrument crate.
6.
Remove the protective cover from the
7300/7500/7500 Fast instrument.
7.
Position yourselves on either side of the
instrument and grasp it firmly at the corners.
8.
Keeping your back straight, lift with your legs
and place the instrument onto the bench. Place
the instrument on the bench next to the computer
as shown below.
GR2371
7300/7500
step 1
GR2351
7300/7500
box explode (step 2)
Cut and
remove
Cut and
open
Remove
and set
aside
Remove
and
discard
Remove
and
discard
Keep back straight
Bend at knees
GR2373
7300/7500
step 5
GR2349
7300/7500
People Lift