Step 3
1. Replace the
Wall Jamb[03].
Tighten the
screws by the allen key.
Step 4
1. Position the
Bottom Rail [06]
on the floor,
perpendicular to the
Wall Jamb[03].
Both
Wall
Jamb[03]
and
Bottom Rail [06]
have a 45
°
angle
to ensure a perfect connection. Make sure their
edges match. Measure the distance from each
end of
Bottom Rail [06]
to the back wall to be
sure the bottom rail is straight. They should be
the same.
2.Using a pencil, mark location of all four screw
holes for
Bottom Rail [06]
(Fig 4).
Fig 3
3
Fig4
8
Содержание SD-AZFL06001 Series
Страница 5: ...Left hand door installation shown Right hand door installation shown...
Страница 6: ...DIMENSIONS 34 864mm 0 0 74 1880mm 0 4...
Страница 16: ...ANZZI...