background image

INSTALLATION GUIDE 

• Please check the product for transit damage, missing parts immediately. Damage reported

later cannot be accepted.  Please handle the product with care. Avoiding any impact on all sides

and edges of the glass.

• Consult your local plumbing codes prior to installation.

• To reduce the risk of breakage, keep corner protectors on glass while installing.

• If this unit is going to be installed in a new construction, please install all of the required

plumbing and drainage before installing the shower.  Use a competent and licensed (if required

by local code) plumber for all plumbing installation.

• Please make sure that prior to beginning the installation, the surfaces are leveled and solid

and will be able to support the total weight of the unit. Also make sure the walls are at right angles.

Irregular installation surface level, radius corners or improper angle of side walls will result in

serious problems for your installation. Please note that some adjustments and drilling might be

necessary during the installation process.

• Please protect all primary surfaces of the product during installation.  Never set your glass

down directly onto a tile floor. Leave corner protectors in place until necessary to remove them.

Always use a piece of wood or cardboard to protect the bottom edge and corners ofthe glass

prior to and during installation.

LL 

WARNING

• Special care should be taken to avoid hidden pipes or electrical cables when drilling holes

on walls .

• This product is heavy and may require two people to install.

• When cutting or drilling metal components or when handling glass, to reduce the risk of

personal injury, protective eye wear, gloves, and closed-toe shoes are required.

• Failure to install this product according to installation instructions may result in personal

injury, property damage, or product failure, and may void the warranty.

Содержание SD-AZFL06001 Series

Страница 1: ...TION MANUAL V1 3 DON TWAIT REGISTER NOW Register your product within 90 days to ensure your product is recognized as an official purchase and is eligible for warranty coverage Mail in the completed re...

Страница 2: ...oncard below Byreturningthisregistration cardweconfirmthedateofpurchaseforyournewproduct Thisconfirmationwillallow ustoprocessanywarrantyclaims Mail the card to 5701 NW 35 Avenue Miami FL 33142 1 CUT...

Страница 3: ...rface level radius corners or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installati...

Страница 4: ...material with any questions regarding the drilling of holes into their product Tools Required 1 ii I This product is heavy and 05 16 I Philips Tape may require two people to Level Drill 8mm Knife Scre...

Страница 5: ...Left hand door installation shown Right hand door installation shown...

Страница 6: ...DIMENSIONS 34 864mm 0 0 74 1880mm 0 4...

Страница 7: ...5 PARTS Ol Plastic anchor X6 Q llill 1111 11 C C 02 5crew STSX40mm 1 9 16 X6 03 Vertical Rail Xl 04 Vertical Rail Seal Strip Xl C C OS Fixed Panel Xl 06 Bottom Rail Xl 07 Bottom Rail Seal Strip Xl...

Страница 8: ...ll Jamb Seal 1 OS Fixed Panel 1 06 Bottom Rail 1 07 Bottom Rail Seal 1 02 03 _JQ_2 GLASS THICKNESS 10mm 3 8 NOTE INSTALLATION MUST BE DONE BY A QUALIFIED LICENSED PROFESSIONAL ATTENTION e To avoid per...

Страница 9: ...to the intended position Make sure the Wall Jamb 03 is resting on the floor or base and is level The end that should be resting on the floor has a 45 angle Mark the center of the holes on the wall for...

Страница 10: ...Jamb 03 Both Wall Jamb 03 and Bottom Rail 06 have a 45 angle to ensure a perfect connection Make sure their edges match Measure the distance from each end of Bottom Rail 06 to the back wall to be sure...

Страница 11: ...d a rubber mallet can be used to insert Wall Plugs 0l 3 To reduce risk of property damage the use of metal hammers is not recommended If needed use drill to slightly enlarge the opening of the hole IM...

Страница 12: ...the Wall Jamb Seal 04 to the Fixed Panel OS The top end ofthe Wall Jamb Seal 04 should meet the top ofthe glass The bottom end should leave a gap of 10mm from the bottom ofthe glass Step 8 1 Install t...

Страница 13: ...unami Guard coated side of the glass panel should face into the shower while the uncoated side faces out of the shower The Fixed Panel S has a sticker s indicating which side should face in and out St...

Страница 14: ...Silicone Sealant on the Wall Jamb 03 and Bottom Rail 06 along the bottom profile and wall profiles Fig 11 3 5 The sealant should be applied to the interior edge 8 I 24 hours I Allow 24 hours for silic...

Страница 15: ...use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent damage to the finish pe...

Страница 16: ...ANZZI...

Отзывы: