Antti-Teollisuus Oy
12
408102 02-2020
Vacboost WM09
Dryer Heater
Lifting the dryer heater in place
- When lifting the heater, observe the following:
- use all the lifting lugs provided
- ensure that the lifting gear stays in position in the lugs
- only use hoists with sufficient lifting capacity
- never go under or too near the unit to be lifted
- Lift the heater without the burner in the place presented in the installation drawing or plan. Because the founda-
tion must be level and steady by default, there is no need to attach the heater specifically to its bed.
Installing the air ducts
- The air ducts between the dryer heater and the dryer shall be assembled of air duct parts D1250 or the heater
shall be connected to the dryer according to the picture above.
- Normally, the inlet air duct from the heater will be routed to the lowermost drying sections. The blower unit, or
units, shall be installed so that even small batches can be dried.
- The air ducts shall be installed so that neither loose grain nor debris can slide directly into the heater from the
air channel end of the drying section.
- Before installing the ducts, make sure that no foreign objects have ended up inside the heater.
WARNING! Foreign particles inside the heater are a fire hazard!
The maximum effect allowed for the heater is 1,500 kW, which must not be exceeded.
The given maximum gas volumes are indicative only. The required volume is affected by the energy content of the
gas. Turn to your gas supplier for more detailed information:
Liquid gas
58.4 m
3
/h
Natural gas
150.0 m
3
/h
If you know the energy content of the gas, you will be able to calculate exactly the maximum allowed gas volume.
NOTE!
The maximum allowed output of the heater must not be exceeded!