
26 User manual OR 100 /110, ed. 5
manuals (pump, autosampler etc.) and the installation guide provided in
the ALEXYS connection kit.
Mains connections
OR 110 does not have a power switch. Plugging in power cord to
mains immediately powers up all connected devices.
Before connecting power cords, check fuse rating and mains power
specifications of ALL devices. See user manuals for details.
•
Connect the 1.8m power cord (p.n. 250.0141) to the DECADE II detec-
tor and socket 2 of the OR 110 (see Fig. 9).
•
Connect the 0.6 m power cord (p.n. 250.0140) to the AS 100 or AS
110 autosampler and socket 3 of the OR 110.
•
Connect the OR 110-LC 110 power cord (p.n. 250.0144) to the LC 110
pump and socket 4 of the OR 110. If the system has 2 pumps connect
the second pump to socket 5.
Do NOT connect OR 110 to mains power at this point yet.
Table V. Connection scheme OR 100 power cables.
Outlet no.
Part no.
Connect to
1
250.0116
Mains
2
250.0141
DECADE II detector
3
250.0140
AS 100/110 autosampler
4
250.0144
LC 110 pump
Use the manufacturer-supplied power cable(s) only to connect all
other devices with the OR 110. Manufacturer will not accept any lia-
bility for damage, direct or indirect, caused by connecting this instru-
ment to devices, which do not meet relevant safety standards.
Serial connections
Содержание ALEXYS OR 100
Страница 31: ...CHAPTER 3 Installation guide 31 ...