C13961
5800_1.
fm
- 19 -
IT
GB
DE
FR
ES
English
5 - Remove the sticker from the nameplate and ap-
ply the new one to identify the gas being used.
Important
On completion of the operation, make sure
that there are no gas leaks or malfunctions.
Important
Before it is put into service, the system
must be tested to check the operating con-
ditions of every single component and
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
full.
To test the system, make the following checks.
1 - Turn on the gas supply tap and check that the
connections are right.
2 - Check that the mains gas is the same as that
used for commissioning of the appliance, and
carry out the conversion procedure if necessary
(see page 18).
3 - Check that the burner is switching on correctly
and its combustion.
4 - Check that the safety thermocouple is wo rking
correctly.
5 - Check that there are no gas leaks.
6 - Check that the nameplates specify the
correct gas for the country of use.
After testing, if necessary instruct the user in
all the skills necessary for putting the appliance into
operation in conditions of safety, in accordance with
legal requirements.
TESTING OF THE APPLIANCE
Important
Before making any type of adjustment, acti-
vate all the safety devices provided and de-
cide whether staff at work and those in the
vicinity should be informed. In particular,
turn off the gas and water supply taps, cut
off the electricity supply using the master
switch and prevent access to all devices
which might cause unexpected health and
safety hazards if turned on.
ADJUSTMENTS
8
RECOMMENDATIONS FOR ADJUSTMENTS
IDM-3960200250.tif
C139615800_1.fm Page 19 Monday, December 20, 2010 3:36 PM