NT_ANEP_P3GU_07-12-2018
NT_ANEP_P4GU_VoLTE_EN_12-05-2022
10 / 48
5mm
INSTALLATION
ATTACHMENT
Check the mobile network strength by the green network strength LED
(see chapter “Signals”, page 39)
Locate an area where the GSM signal is sufficient, ANEP recommends 3 fla
shes of the green LED.
Note: The network may vary depending on the telephone company.
• Make two holes of ø5 mm in diameter on the wall spaced between them by 50 mm.
• Insert the 2 dowels and tighten the screw up to 5 mm away from the wall.
• Insert the P4GU VoLTE device, through the two posterior eyelets, on the 2
screws from the wall.
50mm
ø5
ø5