Commissioning
32
Commissioning protocol
Commissioning Protocol SUPAflo EVO
Project
Boiler type
Project
Serial number
Address
Year
City
Nominal load (Hi) [kW]
Date
Nominal output (Hi) [kW]
Engineer
System
Water pressure
[bar]
Installation:
Roof top
□
Water pH
[-]
Ground floor
□
Water hardness
[ºdH]
Basement
□
Water chloride
[mg/l]
Other: .........................
□
Water ΔT full load
[ºC]
Hydraulics:
Low velocity header
□
Water Δpboiler
[kPa]
Plated heat exchanger
□
Water flow
[m3/h]
Bypass boiler
□
Pump setting
[-]
Other: .........................
□
Safety devices
High limit settng
[ºC] Water flow sensor checked
□
Temp. limiter setting
[ºC] Fluegas sensor checked
□
Min. gas pressure switch setting
[mbar]
Ignition time burner
[sec]
Combustion analysis
100% load
50% load
Min. load
Gas consumption
[m3/h]
[m3/h]
[m3/h]
Gas pressure
[mbar]
[mbar]
[mbar]
CO2
[%]
[%]
[%]
O2
[%]
[%]
[%]
CO
[ppm]
[ppm]
[ppm]
NOx
[ppm]
[ppm]
[ppm]
Tatmospheric
[ºC]
[ºC]
[ºC]
Tfluegas
[ºC]
[ºC]
[ºC]
Twater, flow
[ºC]
[ºC]
[ºC]
Twater, return
[ºC]
[ºC]
[ºC]
Ionisation current
[μA]
[μA]
[μA]
pfan
[mbar]
[mbar]
[mbar]
ptop panel
[mbar]
[mbar]
[mbar]
p
combustion chamber
[mbar]
[mbar]
[mbar]
Remarks
Содержание SUPAflo EVO SF60 EVO
Страница 1: ...INSTALLATION AND SERVICE MANUAL SUPAflo EVO Water Heater SF60 EVO...
Страница 2: ......
Страница 15: ...Installation 15 EN Disassemble the casing 7 8 9...
Страница 23: ...Installation 23 EN Wiring diagram Boiler...
Страница 46: ...Note 46 Note...
Страница 47: ...Note 47 EN Note...