Phase 2
Post, Beam Plate and Feet Assembly
5
4
3
1
5
2
3
4
Once complete, lay each beam assembly
between each foot assembly.
NOTE:
Make sure the Outer-to-Inner
beams are mounted to the ends while the
Inner-to-Inner beams go in between them.
Place (do not fasten) the vertical posts on
each of the footer assemblies.
Slide the beam assemblies onto each of
the vertical posts and fasten each side of
the beam using 2 screws.
Take the exposed end of the power entry
and feed through the desired end of the
beam and into the adjacent post-opening.
Continue to feed the power entry until
the exposed end is out through one of
the base plate’s openings.
Secure the post to the footer assembly
using a 7/16” spanner.
4
2
4
4
4
are slightly longer than
Ou
ter-
to-In
ner
Be
am
Ou
ter-
to-I
nne
r
Be
am
Inn
er-t
o-In
ner
Be
am
NOTE:
Inner-to-Inner beams
Outer-to-Inner beams.
NOTE:
L-shaped configurations
must use inner-to-inner beam
1
* Use phillip head screw to mount
beams on vertical posts.
ILINE
180
o
(2-Way) Post
Installation Guide
6
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.
Содержание ILINE
Страница 1: ...ILINE power data beam Installation Guide...
Страница 3: ...ILINE installation guide 180 2 WAY...
Страница 10: ...ILINE installation guide 120 3 WAY...
Страница 17: ...ILINE installation guide 90 180 4 WAY...