Phase 7
Final Adjustments
1
2
Check the vertical and horizontal alignment
of the beams and screens.
If not aligned, use a 1/2” spanner to rotate the
coupling nuts on the base to change each
corner’s elevation until leveled.
NOTE:
Use a leveling guide for accuracy.
1
* Adjust height of each coupling-nuts
to level the base plate of each post.
2
Horizontal ali
gnment
Ve
rtical alignment
Completed ILINE
ILINE
90°/180° (4-Way) Post
Installation Guide
28
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.
Содержание ILINE
Страница 1: ...ILINE power data beam Installation Guide...
Страница 3: ...ILINE installation guide 180 2 WAY...
Страница 10: ...ILINE installation guide 120 3 WAY...
Страница 17: ...ILINE installation guide 90 180 4 WAY...