![AMQ Solutions ILINE Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/amq-solutions/iline/iline_installation-manuals_2935842024.webp)
Phase 4
Jumpers
1
2
3
1
2
2
Connect power entry plug to the junction block.
Feed the jumper through the beam canal and
into the vertical post opening into the next beam
assembly.
Connect the jumper to each junction block.
Repeat Steps 1-3 until the last jumper is
connected the last junction block.
The remaining installation of electrical must
be installed by a professional electrician.
STOP
3
4
ILINE
90°/180° (4-Way) Post
Installation Guide
24
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.
Содержание ILINE
Страница 1: ...ILINE power data beam Installation Guide...
Страница 3: ...ILINE installation guide 180 2 WAY...
Страница 10: ...ILINE installation guide 120 3 WAY...
Страница 17: ...ILINE installation guide 90 180 4 WAY...