Phase 6
Screens
#6 Allen Wrench
(Angle-tip is recommended)
1
2
3
1
2
3
4
1
2
Place 2 screen clips on top of each beam and
loosely link both sides with a screw and nut.
Insert plastic sleeves into the opening of each
screen clip.
Insert the screen into the screen clip. Make sure
the metal side is down and fabric side is up.
Tightly screw the screen clips with #6 allen
wrench to secure the screens in place.
Repeat Steps 1-4 for each screen.
3
4
5
NOTE:
Pre-measuring each clip’s distance
from the beam ends before attaching will
ensure a centered and balanced appearance
to the installed screen. (Suggested distance
between clip and beam edge: 11 inches.)
NOTE:
For 22” or 28” high screens,
metal strip along the length of
the screen should be located
on the bottom when installed.
NOTE:
Frosted glass screens cannot
be used with ILINE.
ILINE
90°/180° (4-Way) Post
Installation Guide
27
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.
Содержание ILINE
Страница 1: ...ILINE power data beam Installation Guide...
Страница 3: ...ILINE installation guide 180 2 WAY...
Страница 10: ...ILINE installation guide 120 3 WAY...
Страница 17: ...ILINE installation guide 90 180 4 WAY...